01.03.2013 Views

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bibliography October 2005<br />

Tetra Tech, Inc. Santa Cruz River Shared Use Path, Phase 1, Cortaro Road to <strong>Twin</strong> <strong>Peaks</strong><br />

Road, Town of Marana, Arizona, Design Concept Report Project #TEA-MRN-0-<br />

(12)A, ADOT TRACS # SL475-01D. May 2002.<br />

Tetra Tech, Inc. Santa Cruz River Shared Use Path, Phase 2, <strong>Twin</strong> <strong>Peaks</strong> Road to Coachline<br />

Boulevard, Town of Marana, Arizona, Design Concept Report Project #TEA-MRN-0-<br />

(13)A, ADOT TRACS # 0000 PM MRN SL486-01D. May 2002.<br />

The Planning Center and the WLB Group, Inc. Continental Ranch Specific Plan. adopted<br />

April 5, 1988 and amended 8 times to 2002.<br />

Town of Marana. General Plan Update. Adopted by Town Council November 5, 2002.<br />

Town of Marana. Marana Master Transportation Plan. Adopted by Town Council 1989.<br />

Town of Marana. Staff Report to the Marana Planning Commission, Land Development<br />

Code Amendment adding Section 24.02 – Bajada <strong>Environmental</strong> Resource Overlay<br />

District. November 19, 2003.<br />

Town of Marana. Town of Marana Santa Cruz River Corridor Plan Technical Advisory<br />

Group Findings and Community Task Force Recommendations, October 31, 2001.<br />

Transportation Safety Board of the National Academies. Highway Capacity Manual.<br />

Washington DC. TRBNRC. 2000.<br />

URS Corp. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista, ADOT Project No.<br />

0<strong>10</strong>-d (AIW), TRACS No. <strong>10</strong> PM 236 H5838 01C, Biological Evaluation. July 27,<br />

2004.<br />

URS Corp. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista, ADOT Project No.<br />

0<strong>10</strong>-d (AIW), TRACS No. <strong>10</strong> PM 236 H5838 01C, Cultural Resources Survey Report.<br />

August 2004.<br />

URS Corp. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista, ADOT Project No.<br />

I- 0<strong>10</strong>-D 305, TRACS No. <strong>10</strong> PM 236 H5838 01D, Final <strong>Traffic</strong> Noise Analysis<br />

Report. September 2004.<br />

URS Corp. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista, ADOT Project No.<br />

0<strong>10</strong>-d (AIW), TRACS No. <strong>10</strong> PM 236 H5838 01C, Initial AASHTO Controlling<br />

Design Criteria Report. November 2003.<br />

URS Corp. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista, ADOT Project No.<br />

0<strong>10</strong>-d (AIW), TRACS No. <strong>10</strong> PM 236 H5838 01C, Preliminary Initial Site<br />

<strong>Assessment</strong>. January 14, 2004.<br />

URS Corp. and Entranco. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista,<br />

ADOT Project No. I- 0<strong>10</strong>-D 305, TRACS No. <strong>10</strong> PM 236 H5838 01D, Final Drainage<br />

Report. May 21, 2004.<br />

URS Corp. and JE Fuller Hydrology and Geomorphology. Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong><br />

at <strong>Twin</strong> <strong>Peaks</strong>/Linda Vista, ADOT Project No. 0<strong>10</strong>-d (AIW), TRACS No. <strong>10</strong> PM 236<br />

H5838 01C, Santa Cruz River at <strong>Twin</strong> <strong>Peaks</strong> Road Existing Hydraulics Report.<br />

January 14, 2004.<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

8-3<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!