I-10 Twin Peaks Traffic Interchange, Environmental Assessment
I-10 Twin Peaks Traffic Interchange, Environmental Assessment
I-10 Twin Peaks Traffic Interchange, Environmental Assessment
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Project Preparers and Contributors October 2005<br />
CHAPTER 7: PROJECT PREPARERS AND<br />
CONTRIBUTORS<br />
Federal Highway Administration<br />
Stephen Thomas <strong>Environmental</strong> Program Manager<br />
Town of Marana<br />
Harvey Gill Interim Director of Public works<br />
Kevin Thornton, PE Project Manager<br />
Farhad Moghimi<br />
Arizona Department of Transportation<br />
Melissa Maiefski <strong>Environmental</strong> & Enhancement Group<br />
Laurel Parker Project Manager, Tucson District<br />
Kae Neustadt <strong>Environmental</strong> & Enhancement Group<br />
Ed Green <strong>Environmental</strong> & Enhancement Group<br />
Fred Garcia <strong>Environmental</strong> & Enhancement Group<br />
Laura Tsosie <strong>Environmental</strong> & Enhancement Group<br />
URS Corporation<br />
Scott Stapp <strong>Environmental</strong> <strong>Assessment</strong> Manager<br />
William Dehn, PE Roadway Design<br />
Eric Sibson, PE Roadway Design<br />
Gene Rogge, PhD Cultural Resources<br />
Jean Paul Charpentier Biology<br />
Barbara Garrison Biology<br />
Dana Strength Geology and Water Resources<br />
Mary Burke Hazardous Materials<br />
Michael Pegnam, PE Geotechnical<br />
Jaime Wood Land Use and Socioeconomics<br />
Kimley-Horn and Associates, Inc.<br />
David Perkins, PE, PTOE <strong>Traffic</strong> Analysis<br />
Scott Beck, PE<br />
Kaneen Advertising and Public Relations, Inc.<br />
Nanette Pageau Public Involvement<br />
Carol Oaks<br />
Entranco<br />
Mike Bertram, PE Drainage<br />
Edie Griffith-Mettey, PE<br />
Wheat Scharf Associates<br />
Liba Wheat, RLA Visual Resources/Landscaping<br />
Laura Mielcarek, RLA<br />
JE Fuller Hydrology and Geomorphology<br />
John Wallace, PE Hydraulics/Hydrology<br />
Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />
<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />
7-1<br />
Project No.: NH-0<strong>10</strong>-D (AIW)<br />
TRACS No.: <strong>10</strong> PM 236 H5838 01D