Public Involvement/Project Coordination October 2005<br />

Comment: Concerns about property values after the project (3 comments)<br />

Response: It is anticipated that greater access to I-<strong>10</strong> and areas east of the Santa Cruz<br />

River would enhance the area’s desirability and value.<br />

Comment: Concerns about conflicts/coordination with other projects (3 comments)<br />

Response: Relationships with other projects were considered and are addressed in<br />

Chapter 2, Conformance with Regulations, Land Use Plans, and Other Plans, page 2-7.<br />

Comment: Concerns/questions about changes in land uses/zoning (3 comments)<br />

Response: This project proposes no changes to land use or zoning within the project<br />

area. Although some changes in land use or zoning may occur, these changes would be<br />

under authority of the Town of Marana or Pima County (near the proposed <strong>Twin</strong> <strong>Peaks</strong><br />

Road TI).<br />

Comment: Concerns about bicycle facilities and connections (2 comments)<br />

Response: Pedestrian and bicycle facilities are included in this project (see Chapter 3,<br />

Proposed Bicycle and Pedestrian Facilities, page 3-20).<br />

Comment: Concerns about widening <strong>Twin</strong> <strong>Peaks</strong> Road (2 comments)<br />

Response: The project proposes no widening of the existing portion of <strong>Twin</strong> <strong>Peaks</strong> Road<br />

(see Chapter 3, Preferred Alternative, page 3-11).<br />

Comment: Concerns about visual impacts (1 comment)<br />

Response: A visual impacts analysis was completed for this project (see Chapter 4,<br />

Visual Resources, page 4-41).<br />

Comment: Concerns about increased traffic through neighborhoods (1 comment)<br />

Response: <strong>Traffic</strong> volume increases have been predicted on <strong>Twin</strong> <strong>Peaks</strong> Road and<br />

Coachline Road as a result of the project, but increases in traffic on neighborhood streets<br />

are not anticipated. Issues associated with unanticipated impacts from the project would<br />

be addressed by the Town of Marana through established processes and procedures.<br />

Comment: Concerns about truck traffic in area (1 comment)<br />

Response: An increase in trucks to 2 percent of the total traffic volume along <strong>Twin</strong> <strong>Peaks</strong><br />

Road was predicted by the traffic report.<br />

Comment: Concerns about stormwater runoff (1 comment)<br />

Response: The drainage study recommended a number of drainage improvements in the<br />

area (see Chapter 3, Proposed Drainage Improvements, page 3-22).<br />

Comment: Concerns about utilities (1 comment)<br />

Response: Utilities have been contacted and are participating in the project. Impacts to<br />

utilities are discussed in Chapter 4, Utilities and Railroad, page 4-97).<br />

Comment: Questions about phasing of construction (1 comment)<br />

Response: It is likely that the project would be phased, but phasing would be developed<br />

as a part of final design.<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

5-7<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D