Public Involvement/Project Coordination October 2005<br />

The third meeting of the environmental working group was held on May 13, 2004. The<br />

meeting was attended by the Town of Marana, FHWA, ADOT, USFWS, AGFD, and the<br />

consultant team. The intent of the meeting was to update all parties on the current status<br />

of the project and to solicit comments on the proposed design so that suggestions could<br />

be considered for incorporation into the project plans. The Town of Marana’s three year<br />

survey efforts for the CFPO were discussed. Coordination with other ongoing projects in<br />

the study area was discussed. Construction techniques and timing within the Santa Cruz<br />

River and maintenance or replacement of vegetation were discussed. The sizing of<br />

drainage facilities on both sides of the interstate to accommodate wildlife crossing was<br />

discussed.<br />

Scoping Meeting with Saguaro National Park - Comments and Response Summary<br />

At the request of the NPS, a meeting was held on November 13, 2003. Attendees<br />

included the Town of Marana, NPS, and the project consultant team. Project issues<br />

related to SNP are discussed in detail in Chapter 4, Affected Environment. The first public<br />

information meeting for the <strong>Twin</strong> <strong>Peaks</strong> Road TI was discussed. NPS supports the <strong>Twin</strong><br />

<strong>Peaks</strong> Road TI and expressed a desire to close Picture Rocks Road through SNP after the<br />

TI is constructed.<br />

Technical Advisory Committee (TAC) Meetings - Comments and Response Summary<br />

The TAC was formed early in the project to help guide decisions. The TAC consisted of<br />

technically based individuals who participated in discussions and review of documents and<br />

concepts. Several potentially impacted agencies served on the TAC and this provided a<br />

broader perspective to the project. Members of the TAC included representatives from the<br />

Town of Marana, ADOT, FHWA, UPRR, PAG, PCDOT&FCD, and the consultant team.<br />

The TAC met on October 1, 2003 and on January 8, February 26, and May 13, 2004.<br />

Public Information Meetings<br />

A number of meetings with the affected community have been conducted. These have<br />

included a collective meeting with residential property owners, meetings with the<br />

Continental Ranch and Sunflower Neighborhood Associations, two public information<br />

meetings, two collective meetings with area business owners, and numerous meetings with<br />

individual residential property owners and business owners.<br />

Property Owner Informational Meeting - Comments and Response Summary<br />

Meetings with the Continental Ranch and Sunflower Neighborhood Associations were<br />

held on August 26, 2003 and August 27, 2003, respectively. A total of 20 attended the<br />

Continental Ranch presentation and approximately <strong>10</strong>0 attended the Sunflower<br />

presentation. Comments and questions from the associations and responses to the<br />

comments and questions are presented in the following table.<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

5-3<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D