A <strong>Self</strong>-<strong>Learning</strong> <strong>Manual</strong><br />

Mastering Different Fields <strong>of</strong> Civil Engineering Works (VC-Q&A Method) Vincent T. H. CHU<br />

unconfined compressive strength is generally higher than normal concrete<br />

(no reinforcement in concrete in bell-out region). Therefore, someone may<br />

query the reason <strong>of</strong> replacement <strong>of</strong> strong rock by weaker concrete during<br />

the formation <strong>of</strong> bell-out.<br />

When piles are concreted by tremie concrete method, soil sediments at the<br />

pile toe inside the bell-out are pushed aside and trapped in the tip <strong>of</strong><br />

bell-out. Consequently, this would impair the functionality <strong>of</strong> the bored<br />

piles.<br />

To maintain the stability <strong>of</strong> hanging side slope <strong>of</strong> bell-out, it requires the<br />

bell-out to be formed wholly inside sound rock. However, the rock above<br />

bell-out may be weather rock so that the hanging rock is liable to fall down<br />

and soil may collapse.<br />

7. There is a general trend that toe defects in bored pile construction<br />

have become more serious. Why? (BP5)<br />

Direct coring method is commonly employed to check the quality and<br />

workmanship <strong>of</strong> bored piles. It is further divided into two main types,<br />

namely interface coring (pile/rock interface) and full coring (entire concrete<br />

pile length). In the past, the implementation <strong>of</strong> full-depth coring usually<br />

takes place near the pile centre to prevent physical conflicts with<br />

reinforcement cage. When placing concrete by tremie method, concrete<br />

pouring by tremie pipe is carried out near pile centre and s<strong>of</strong>t and weak<br />

materials are usually displaced to the sides <strong>of</strong> bored piles. As a result, the<br />

pile/rock interface at pile centre should indicate the best results. However,<br />

with the recent trend <strong>of</strong> using interface coring through reservation tube<br />

attached to the reinforcement cage, there is a high chance that interface<br />

coring gives poor results as the reinforcement cage may trap s<strong>of</strong>t and weak<br />

materials and they are located far from the pile centre.<br />

8. Is it totally unacceptable that soil sediments are found at pile toe <strong>of</strong><br />

bored piles? (BP5)<br />

The pile toe is usually cleared by airlifting prior to concreting. However,<br />

once the air-lifting operation ceases and concreting operation are not<br />

carried out simultaneously, suspended sediments would tend to settle and<br />

form the soil sediments at pile toe <strong>of</strong> bored piles. The layer <strong>of</strong> soil<br />

sediments is considered to be unacceptable by most engineers as they<br />

claim that it would impair the structural performance <strong>of</strong> bored piles.<br />