05.03.2013 Views

A Self-Learning Manual - Institution of Engineers Mauritius

A Self-Learning Manual - Institution of Engineers Mauritius

A Self-Learning Manual - Institution of Engineers Mauritius

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A <strong>Self</strong>-<strong>Learning</strong> <strong>Manual</strong><br />

Mastering Different Fields <strong>of</strong> Civil Engineering Works (VC-Q&A Method) Vincent T. H. CHU<br />

However, the suggestion <strong>of</strong> provision <strong>of</strong> nominal reinforcement to cater for<br />

seismic effect may be justified. Reference is made to J P Tyson (1995).<br />

19. How to measure rock during piling operation?<br />

There is no strict rule in governing the measure <strong>of</strong> rock encountered in<br />

piling operation. There are two common practices in measuring rock during<br />

piling:<br />

(i) Measure the quantity <strong>of</strong> obstruction taken out from the drilled out;<br />

(ii) Firstly, it is assumed that the rock surface is uniform. Based on this<br />

assumption, measure the obstruction level by using a tape.<br />

20. What are the advantages <strong>of</strong> using top-down approach in basement<br />

construction?<br />

The advantages <strong>of</strong> top-down approach are listed below:<br />

(i) The structures above ground can be carried out simultaneously with<br />

the structures below ground. This greatly reduces the time for<br />

construction.<br />

(ii) By using this approach, settlement can be reduced.<br />

(iii) Since the permanent columns and slabs can be utilized to support<br />

loadings during construction, it saves the cost <strong>of</strong> formwork.<br />

Note: Top-down approach means construction <strong>of</strong> basement is carried out<br />

from ground level downwards.<br />

21. What are the methods to tackle negative skin friction? (FD12)<br />

(i) Use slender pile sections (e.g. H-pile or precast pile) because smaller<br />

pile area when subject to the same working load would produce<br />

higher deformation, thus increasing the relative downward movement<br />

<strong>of</strong> piles.<br />

(ii) In a certain region <strong>of</strong> H-piles for ground water table fluctuation,<br />

painting is applied on the surface <strong>of</strong> H-piles because the rise and fall<br />

<strong>of</strong> water table contribute to the corrosion <strong>of</strong> H-piles. On the other hand,<br />

to reduce the effect <strong>of</strong> additional loads brought about by negative skin<br />

friction, bitumen is applied on the pile surface corresponding to the<br />

region <strong>of</strong> soils that has negative skin friction. However, bitumen<br />

232

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!