03.08.2013 Views

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Tender</strong>er is not allowed to quote the rates in part <strong>for</strong> any specific package or<br />

part <strong>of</strong> package. <strong>Tender</strong>er is required to quote unit rates individually <strong>for</strong> all<br />

items <strong>of</strong> the Schedule (except <strong>for</strong> AMC) only against the respective items in<br />

the Rate Sheet <strong>of</strong> Schedule <strong>of</strong> Requirement and only in the Financial Bid. The<br />

AMC Rates are to be quoted by <strong>Tender</strong>ers separately with detailed breakup.<br />

The rates or costs <strong>of</strong> AMC shall not be considered <strong>for</strong> determination <strong>of</strong> interse<br />

ranking during evaluation <strong>of</strong> Financial Bid.<br />

3.4 Clarification <strong>of</strong> bid : To facilitate evaluation <strong>of</strong> bids, the purchaser may at its<br />

discretion ask tenderer(s) <strong>for</strong> clarification <strong>of</strong> their <strong>of</strong>fer(s). Any clarification<br />

submitted by the tenderer after opening <strong>of</strong> the tender that is not in response to<br />

the request by the purchaser may not be considered. The purchaser’s request<br />

<strong>for</strong> such clarifications and response shall be in writing. No change in the<br />

prices or substance <strong>of</strong> the bid shall be sought, <strong>of</strong>fered or permitted except to<br />

confirm the correction <strong>of</strong> arithmetic errors discovered by the purchaser in the<br />

evaluation <strong>of</strong> financial bids. If tenderer does not provide clarifications <strong>of</strong> its<br />

bid by the time line set by the purchaser, its bid may be rejected.<br />

3.5 Technical & commercial Bid<br />

3.5.1 The purchaser shall examine all the general and technical aspects <strong>of</strong> the bid<br />

submitted in accordance with tender conditions. The technical bid should<br />

con<strong>for</strong>m to all the tender requirements.<br />

3.5.2 Further technical evaluation shall be carried out only if the conditions laid<br />

in Para 2 <strong>for</strong> Pre-qualification are satisfied. The technical <strong>of</strong>fer shall be<br />

examined by technical evaluation committee who will verify and check the<br />

development in firm’s premises and demonstration <strong>of</strong> development done <strong>for</strong><br />

TCAS.<br />

3.5.3 <strong>Tender</strong>er is required to indicate the status <strong>of</strong> his Technical Capabilities in<br />

<strong>for</strong>m <strong>of</strong> “YES” or “NO” <strong>of</strong> the items enumerated in Para 3.5.5 in the Self<br />

Assessment Sheet <strong>for</strong> Technical Capabilities in Part-II Sec-II Annexure-1.<br />

This assessment by <strong>Tender</strong>er shall be based not on the presumptive status<br />

but on the actual status as on the date not later than that <strong>of</strong> submission <strong>of</strong><br />

the tender. <strong>Tender</strong>er is required to mention the place in India <strong>for</strong> lab<br />

demonstration <strong>for</strong> the purpose <strong>of</strong> Technical Evaluation <strong>of</strong> technical status<br />

by RDSO Team. It shall be responsibility <strong>of</strong> the tenderer to carry out the<br />

arrangements <strong>for</strong> lab demonstration.<br />

3.5.4 <strong>Tender</strong>er is required to mention the place in India <strong>for</strong> lab demonstration <strong>for</strong><br />

the purpose <strong>of</strong> evaluation <strong>of</strong> technical status by RDSO Team. On the basis<br />

<strong>of</strong> the Technical & Commercial <strong>of</strong>fer, Purchaser shall decide the visit <strong>of</strong><br />

RDSO Team to firm’s premises <strong>for</strong> verification <strong>of</strong> Lab demonstration <strong>of</strong><br />

development <strong>of</strong> TCAS to carry out technical evaluation. <strong>Tender</strong>ers are<br />

required to be ready with full preparations <strong>for</strong> lab demonstration after<br />

opening <strong>of</strong> the tender so as to enable RDSO Team to complete technical<br />

evaluation on the same day. RDSO Team is not bound to revisit <strong>for</strong> lab<br />

demonstration.<br />

3.5.5 The basis <strong>for</strong> Technical Evaluation and proposed marks shall be as under:<br />

Page 9 <strong>of</strong> 72 <strong>of</strong> Part-II Sec-II

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!