- Page 1 and 2:
GOVERNMENT OF INDIA MINISTRY OF RAI
- Page 3 and 4:
7.0 Tenderers can download and use
- Page 5 and 6:
GOVERNMENT OF INDIA MINISTRY OF RAI
- Page 7 and 8:
INSTRUCTIONS TO TENDERERS: 0100. GE
- Page 9 and 10:
0500. QUALIFYING REQUIREMENTS OF TE
- Page 11 and 12:
III. Technical and commercial Bid f
- Page 13 and 14:
destination rates unless the tender
- Page 15 and 16:
himself with existing conditions on
- Page 17 and 18:
2211 A list of Test and Measuring I
- Page 19 and 20:
INDIAN RAILWAYS STANDARD CONDITIONS
- Page 21 and 22:
addressed to the Contractor shall b
- Page 23 and 24:
0606. The Contract Performance Guar
- Page 25 and 26:
of a similar description (when stor
- Page 27 and 28:
The contractor shall, if so require
- Page 29 and 30:
The standard payment terms subject
- Page 31 and 32:
The contractor shall perform the co
- Page 33 and 34:
The prices stated are to include al
- Page 35 and 36:
Contractor, or by any one employed
- Page 37 and 38:
3101. The Contractor should take al
- Page 39 and 40:
To The President of India Acting th
- Page 41 and 42:
Page 1 of 1 ANNEXURE-2 PROFORMA FOR
- Page 43 and 44:
PROFORMA FOR AUTHORITY FROM MANUFAC
- Page 45 and 46:
PROFORMA FOR STATEMENT OF DEVIATION
- Page 47 and 48:
To PROFORMA OF BANK GUARANTEE FOR C
- Page 49 and 50:
To PROFORMA OF BANK GUARANTEE FOR 1
- Page 51 and 52:
PROFORMA BANK GUARANTEE FOR BID GUA
- Page 53 and 54:
Annexure -11 CHECK LIST 1. Have you
- Page 55 and 56:
G1.00 Law governing the contract:-
- Page 57 and 58:
G15.00 Provisions of Contract labou
- Page 59 and 60:
of the Contractor or any of his emp
- Page 61 and 62:
ISO 9001: 2008 Effective from 18.06
- Page 63 and 64:
ISO 9001: 2008 Effective from 18.06
- Page 65 and 66:
ISO 9001: 2008 Effective from 18.06
- Page 67 and 68:
ISO 9001: 2008 Effective from 18.06
- Page 69 and 70:
ISO 9001: 2008 Effective from 18.06
- Page 71 and 72:
ISO 9001: 2008 Effective from 18.06
- Page 73 and 74:
ISO 9001: 2008 Effective from 18.06
- Page 75 and 76:
ISO 9001: 2008 Effective from 18.06
- Page 77 and 78:
ISO 9001: 2008 Effective from 18.06
- Page 79 and 80:
ISO 9001: 2008 Effective from 18.06
- Page 81 and 82:
ISO 9001: 2008 Effective from 18.06
- Page 83 and 84:
ISO 9001: 2008 Effective from 18.06
- Page 85 and 86:
ISO 9001: 2008 Effective from 18.06
- Page 87 and 88:
ISO 9001: 2008 Effective from 18.06
- Page 89 and 90:
ISO 9001: 2008 Effective from 18.06
- Page 91 and 92:
ISO 9001: 2008 Effective from 18.06
- Page 93 and 94:
ISO 9001: 2008 Effective from 18.06
- Page 95 and 96:
ISO 9001: 2008 Effective from 18.06
- Page 97 and 98: ISO 9001: 2008 Effective from 18.06
- Page 99 and 100: ISO 9001: 2008 Effective from 18.06
- Page 101 and 102: ISO 9001: 2008 Effective from 18.06
- Page 103 and 104: ISO 9001: 2008 Effective from 18.06
- Page 105 and 106: ISO 9001: 2008 Effective from 18.06
- Page 107 and 108: ISO 9001: 2008 Effective from 18.06
- Page 109 and 110: ISO 9001: 2008 Effective from 18.06
- Page 111 and 112: ISO 9001: 2008 Effective from 18.06
- Page 113 and 114: ISO 9001: 2008 Effective from 18.06
- Page 115 and 116: ISO 9001: 2008 Effective from 18.06
- Page 117 and 118: GOVERNMENT OF INDIA MINISTRY OF RAI
- Page 119 and 120: 0. Preamble: 0.1 It is proposed to
- Page 121 and 122: 1.5.4 The development of the equipm
- Page 123 and 124: and generate brake curve based on t
- Page 125 and 126: 2. Qualifying Requirements of Tende
- Page 127 and 128: SN Description 1 Tenderer is manufa
- Page 129 and 130: SN Description (x) Handling of RF R
- Page 131 and 132: discretion at the time during the 5
- Page 133 and 134: 4.1.1 Contract Package A (Approx. 5
- Page 135 and 136: presentation through fields decoded
- Page 137 and 138: and Vikarabad) in such a way that t
- Page 139 and 140: 4.27.2.1 For On-Board Equipments i.
- Page 141 and 142: S. Description Section On board No.
- Page 143 and 144: 8.4 If it becomes necessary for the
- Page 145 and 146: 15. SUPPLY AND CUSTODY OF MATERIAL
- Page 147: account of another vendor not being
- Page 151 and 152: Contract Package A : Wadi (Excludin
- Page 153 and 154: Contract Package A : Wadi (Excludin
- Page 155 and 156: Contract Package A : Wadi (Excludin
- Page 157 and 158: Contract Package A : Wadi (Excludin
- Page 159 and 160: Contract Package A : Wadi (Excludin
- Page 161 and 162: Contract Package A : Wadi (Excludin
- Page 163 and 164: Contract Package A : Wadi (Excludin
- Page 165 and 166: Contract Package A : Wadi (Excludin
- Page 167 and 168: Contract Package B : Sadashivpet Ro
- Page 169 and 170: Contract Package B : Sadashivpet Ro
- Page 171 and 172: Contract Package B : Sadashivpet Ro
- Page 173 and 174: Contract Package B : Sadashivpet Ro
- Page 175 and 176: Contract Package C : Chitigidda (Ex
- Page 177 and 178: Contract Package C : Chitigidda (Ex
- Page 179 and 180: Part-II Sec.-II Annexure-1: Self As
- Page 181 and 182: SN Description (x) Handling of RF R
- Page 183 and 184: S. No. Item P.5 Supply of complete
- Page 185 and 186: S. No. Item Q.1 Installation & comm
- Page 187 and 188: S. No. Item Unit Qty of Contract Pa
- Page 189: S. No. Item S.9 Supply, Installatio