03.08.2013 Views

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S. Description Section On board<br />

No.<br />

<strong>System</strong>s<br />

b) Contract Package – B Sadashivpet Road (Excluding)<br />

Loco-<br />

LC 13 (bet. Sadashivpet Road – Marpalli) motives :<br />

Design and <strong>Development</strong><br />

<strong>of</strong> <strong>Train</strong> <strong>Collision</strong><br />

<strong>Avoidance</strong> <strong>System</strong><br />

(TCAS) on Sadashivpet<br />

Road (Excluding) – Bidar<br />

Marpalli<br />

Kohir<br />

LC27 (between Kohir – Zahirabad)<br />

Zahirabad<br />

12<br />

section <strong>of</strong> Secunderabad<br />

Division<br />

LC 32 (between Zahirabad – Matalkunta)<br />

LC 33 (between Zahirabad – Matalkunta)<br />

Matalkunta<br />

LC 41 (between Matalkunta - Bidar)<br />

LC 42 (between Matalkunta - Bidar)<br />

Bidar<br />

c) Contract Package – C<br />

Design and <strong>Development</strong><br />

<strong>of</strong> <strong>Train</strong> <strong>Collision</strong><br />

<strong>Avoidance</strong> <strong>System</strong><br />

(TCAS) on Chitgidda<br />

(Excluding) – Lingampalli<br />

section <strong>of</strong> Secunderabad<br />

Division<br />

Chitgidda (Excluding)<br />

Gullaguda<br />

IB (between Gullaguda and Shankarpalli)<br />

Shankarpalli<br />

IB (between Shankarpalli and Nagalpalli)<br />

Nagalpalli<br />

IB (between Nagalpalli and Lingampalli)<br />

Lingampalli<br />

Locomotives<br />

:<br />

8<br />

4.29 The sketches <strong>of</strong> stations, IBS, mid- block section interlocked level crossing gates<br />

and block sections have been provided in this Section <strong>for</strong> broad assessment and<br />

guidance. Railway may carry out the alterations and modifications in the<br />

interlocking or other arrangements at site during the course <strong>of</strong> execution in the<br />

intervening period. The Contractor also shall have to modify or reconfigure the<br />

installation to suit the latest conditions at site without additional cost.<br />

5.0 The model time frame is as under :<br />

Stage. Activities Indicative Period<br />

(months)<br />

b. Supply <strong>of</strong> items ‘D’+ 2<br />

c. Installation <strong>of</strong> equipment at site ‘D’+ 3<br />

d. Up-gradation <strong>of</strong> equipment to<br />

specification<br />

‘D’+ 6<br />

e. Completion <strong>of</strong> trial & ISA<br />

‘D’+ 12 (=’E’)<br />

certification<br />

f. Successful completion <strong>of</strong> Warranty<br />

period<br />

‘E’ + 24<br />

Note: For Category I & Category-II tenderers, D shall be date <strong>of</strong> award <strong>of</strong> tender<br />

Page 24 <strong>of</strong> 72 <strong>of</strong> Part-II Sec-II

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!