8.4 If it becomes necessary <strong>for</strong> the contractor to replace or renew any defective<br />

portions <strong>of</strong> the s<strong>of</strong>tware or hardware under this clause, the provision <strong>of</strong> this clause<br />

shall apply to the portion <strong>of</strong> the equipment replaced or renewed until the expiry <strong>of</strong><br />

six months from the date <strong>of</strong> such replacement or renewal or until the end <strong>of</strong> the<br />

warranty period whichever may be later.<br />

8.5 For ensuring the functioning <strong>of</strong> system during warranty period, the firm shall<br />

provide all spares and manpower at loco shed/s and also <strong>for</strong> maintenance support <strong>of</strong><br />

line side equipment as decided by RDSO/Railways.<br />

8.6 During the Warranty period, the per<strong>for</strong>mance <strong>of</strong> the system shall be evaluated in<br />

terms <strong>of</strong> Para 12 <strong>of</strong> the RDSO Specification No. RDSO/SPN/196 Version 3.1.1.<br />

9. PLACING IN SERVICE AND MAINTENANCE<br />

9.1 After the installation is placed in service, the contractor shall be responsible <strong>for</strong> the<br />

proper functioning <strong>of</strong> the equipment without struck up and malfunction <strong>for</strong> a period<br />

<strong>of</strong> 24 months.<br />

9.2 Any lacuna noticed in the functioning <strong>of</strong> the equipment as a result <strong>of</strong> any wrong<br />

checking feature shall be rectified by the contractor free <strong>of</strong> cost during this period.<br />

9.3 During analysis <strong>of</strong> failures, if s<strong>of</strong>tware bug or any deficiency is pointed out by the<br />

Railway, the contractor shall rectify the deficiency at his own cost and get<br />

modifications validated.<br />

9.4 The firm shall also give cost <strong>for</strong> AMC <strong>of</strong> equipment <strong>for</strong> a period <strong>of</strong> 5 years after<br />

warranty and in service maintenance. The order <strong>for</strong> AMC shall be placed on year to<br />

year basis by Railway and rates awarded shall be valid till the end <strong>of</strong> AMC period.<br />

The firm has to ensure required per<strong>for</strong>mance <strong>of</strong> system during the AMC period as<br />

defined in specification <strong>of</strong> TCAS and <strong>for</strong> this necessary spares and manpower shall<br />

be deployed by firms at loco sheds and other location as decided in consultation<br />

with Railways.<br />

10. INSPECTION<br />

RDSO’s authorised representative would carry out inspection <strong>of</strong> the validation<br />

process during validation and or at the place <strong>of</strong> manufacture be<strong>for</strong>e validated<br />

s<strong>of</strong>tware is submitted. Also, inspection <strong>of</strong> all items supplied shall also be done by<br />

RDSO at the firms premises.<br />

11. TESTING<br />

11.1 Testing <strong>of</strong> the validated s<strong>of</strong>tware after doing modification if any, shall be carried<br />

out by RDSO’s engineer to ensure that all requirements <strong>of</strong> the tenders<br />

specifications are complied.<br />

11.2 If so desired by the RDSO’s engineer, some or all <strong>of</strong> the modifications, tests if<br />

necessary, will be done be<strong>for</strong>e actual use <strong>of</strong> s<strong>of</strong>tware.<br />

Page 26 <strong>of</strong> 72 <strong>of</strong> Part-II Sec-II