ISO 9001: 2008 Effective from 18.06.2012 RDSO/SPN/196/2012 Version 3.1.1<br />

Document Title : Specification <strong>of</strong> <strong>Train</strong> <strong>Collision</strong> <strong>Avoidance</strong> <strong>System</strong><br />

design / configuration and shall be approved by RDSO (the various tests<br />

parameter <strong>for</strong> card level test, system level functional test, diagnostic test and<br />

per<strong>for</strong>mance test shall be specified <strong>for</strong> inclusion in the specification).<br />

15.3 Verification & Validation <strong>of</strong> the s<strong>of</strong>tware and hardware shall be done by<br />

independent assessor as per Safety Integrity Level – 4 (SIL-4) <strong>of</strong> CENELEC<br />

standards or equivalent. Further a comprehensive report from the V&V<br />

consultant, covering full terms <strong>of</strong> reference should be submitted to RDSO <strong>for</strong><br />

final assessment.<br />

16. Tests and Verification<br />

16.1 The test procedure shall be based on the system design. The methodologies to<br />

be adopted <strong>for</strong> various tests shall be decided taking into account the system<br />

design/ configuration and shall be approved by the RDSO.<br />

16.2 The following sequence <strong>of</strong> tests shall be conducted:<br />

• Type tests;<br />

• Acceptance tests;<br />

• Routine Tests;<br />

• <strong>System</strong> acceptance tests;<br />

• Integration Tests;<br />

16.3 Type Tests<br />

16.3.1 Following tests shall constitute type tests:<br />

a) Visual inspection.<br />

b) Insulation Resistance tests<br />

c) Applied high voltage tests<br />

d) Card level/ module level check<br />

e) Card-level functional tests one card <strong>of</strong> each type.<br />

f) <strong>System</strong> level functional tests/ per<strong>for</strong>mance tests<br />

g) Environmental / climatic tests.<br />

h) Vibration tests, abrasive environment tests.<br />

i) <strong>System</strong> Diagnostics test.<br />

j) Any other tests as considered necessary by the purchaser.<br />

k) Integration Tests: Integration tests to integrate the various sub-systems <strong>of</strong><br />

the TCAS and demonstrate correct operation <strong>of</strong> all internal and external<br />

interfaces.<br />

16.3.2 Only one each equipment shall be tested <strong>for</strong> this purpose. The equipment<br />

shall successfully pass all the type tests <strong>for</strong> proving con<strong>for</strong>mity with this<br />

specification. If the equipment fails in any <strong>of</strong> the type tests, the purchaser or<br />

his nominee at his discretion may call <strong>for</strong> another equipment/ card(s) <strong>of</strong> the<br />

same type and subject it to all tests or to the test(s) in which failure occurred.<br />

No failure shall be permitted in the repeat test(s).<br />

16.4 Acceptance Tests<br />

Following shall comprise acceptance tests:<br />

a) Visual inspection.<br />

b) Insulation Resistance tests<br />

c) Applied high voltage tests<br />

d) Card level/ module level check.<br />

e) Card-level functional test on all the cards.<br />

f) <strong>System</strong> level functional tests/ per<strong>for</strong>mance tests.<br />

g) <strong>System</strong> Diagnostics test.<br />

16.5 Routine Tests<br />

Following shall comprise the routine tests and shall be conducted by<br />

manufacturer on each equipment and the test results will be submitted to the<br />

inspection authority be<strong>for</strong>e inspection. The validation report <strong>of</strong> application<br />

s<strong>of</strong>tware in proper <strong>for</strong>mat shall also be submitted to the inspection authority in<br />

advance.<br />

Signal Directorate RDSO/Lucknow Page 38 <strong>of</strong> 56