03.08.2013 Views

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.27.2.1 For On-Board Equipments<br />

i. Installation details, Equipment layout & Brake interface details duly<br />

approved by OEM and Railways,<br />

ii. Manual describing details <strong>of</strong> equipments, their purpose &<br />

specification, principle <strong>of</strong> operation and details <strong>of</strong> power supply<br />

arrangement. It should also include details <strong>of</strong> various components <strong>of</strong><br />

the equipment.<br />

iii. Manual <strong>of</strong> Installation by OEM<br />

iv. Manual <strong>of</strong> Maintenance<br />

v. Pre-Commissioning Checklist<br />

vi. Diagnostic Procedure including troubleshooting<br />

vii. User manual with Do’s and Don’ts<br />

viii. Any other documents required by Railways <strong>for</strong> the normal operation<br />

& maintenance<br />

4.27.2.2 For Stationary Equipments<br />

i. Installation details and Equipment layout duly approved by OEM<br />

and Railways,<br />

ii. Manual describing details <strong>of</strong> equipments, their purpose &<br />

specification, principle <strong>of</strong> operation and details <strong>of</strong> power supply<br />

arrangement. It should also include details <strong>of</strong> various components <strong>of</strong><br />

the equipment.<br />

iii. Manual <strong>of</strong> Installation by OEM<br />

iv. Manual <strong>of</strong> Maintenance<br />

v. Pre-Commissioning Checklist<br />

vi. Diagnostic Procedure including troubleshooting<br />

vii. User manual with Do’s and Don’ts<br />

viii. Any other documents required by Railways <strong>for</strong> the normal operation<br />

& maintenance<br />

4.27.2.3 For Track Side Equipment<br />

i. Site installation details.<br />

ii. Equipment disposition layout,<br />

iii. Manual describing details <strong>of</strong> equipments, their purpose &<br />

specification, principle <strong>of</strong> operation and details <strong>of</strong> power supply<br />

arrangement. It should also include details <strong>of</strong> various components <strong>of</strong><br />

the equipment.<br />

iv. Manual <strong>of</strong> Installation by OEM<br />

v. Manual <strong>of</strong> Maintenance<br />

vi. Diagnostic Procedure including troubleshooting<br />

vii. Pre-Commissioning Checklist<br />

viii. User manual with Do’s and Don’t<br />

ix. Any other drawings/ documents as required by Railway <strong>for</strong> the<br />

successful operation maintenance <strong>of</strong> this system<br />

4.27.2.4 For Central Monitoring Unit<br />

i. Installation details and Equipment layout duly approved by OEM and<br />

Railways,<br />

ii. Manual describing details <strong>of</strong> equipments, their purpose & specification,<br />

principle <strong>of</strong> operation and details <strong>of</strong> power supply arrangement. It<br />

should also include details <strong>of</strong> various components <strong>of</strong> the equipment.<br />

iii. Manual <strong>of</strong> Installation by OEM<br />

iv. Manual <strong>of</strong> Maintenance<br />

v. Pre-Commissioning Checklist<br />

vi. Diagnostic Procedure including troubleshooting<br />

vii. User manual with Do’s and Don’ts<br />

viii. Any other documents required by Railways <strong>for</strong> the normal operation &<br />

maintenance<br />

Page 22 <strong>of</strong> 72 <strong>of</strong> Part-II Sec-II

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!