03.08.2013 Views

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S.<br />

No.<br />

Item<br />

Q.1 Installation &<br />

commissioning <strong>of</strong> complete<br />

TCAS equipment <strong>for</strong> Station<br />

Q.2 Installation &<br />

commissioning <strong>of</strong> complete<br />

TCAS equipment <strong>for</strong> IBS<br />

and Interlocked LC gates<br />

Unit<br />

Qty <strong>of</strong> Contract<br />

Package A<br />

Qty <strong>of</strong> Contract<br />

Package B<br />

Qty <strong>of</strong> Contract<br />

Package C<br />

Total Qty <strong>for</strong> all<br />

packages<br />

Page 68 <strong>of</strong> 72 <strong>of</strong> Part-II Sec.-II<br />

All inclusive<br />

Unit Rates in<br />

figure (in Rs.)<br />

All inclusive Unit Rates<br />

in Words (in Rs.)<br />

Schedule Q - Installation & Commissioning <strong>of</strong> Field Components<br />

Set 14 5 4 23<br />

Set 7 6 3 16<br />

Q.3 Installation &<br />

commissioning <strong>of</strong> RFID tags<br />

<strong>for</strong> station Set 14 5 4 23<br />

Q.4 Installation &<br />

commissioning <strong>of</strong> RFID tags<br />

<strong>for</strong> Block Section including<br />

IBS and interlocked LC<br />

gates<br />

Set 14 5 4 23<br />

Details <strong>of</strong> Taxes / Duties &<br />

other charges as included

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!