give the design <strong>of</strong> such towers alongwith site proposed to be installed and safety<br />

certificate by the independent consultant. The site <strong>for</strong> each tower is required to be<br />

got approved by the competent Railway authority also.<br />

4.9 Loco equipment shall be maintained in the Electric and Diesel locosheds<br />

nominated by South Central Railway. The firms are required to provide test bench<br />

<strong>for</strong> maintenance and repair at these sheds and also to test and troubleshoot loco<br />

equipment when it is coming out from locoshed. A kit <strong>for</strong> configuring,<br />

programming and downloading the Loco Equipment is also required to be provided<br />

by the firm.<br />

4.10 The firm is also required to supply programming kit <strong>for</strong> RFID tags and test setup<br />

<strong>for</strong> station equipment <strong>for</strong> maintenance and repair <strong>of</strong> way side equipment at a<br />

location identified by Railways. A kit <strong>for</strong> configuring, programming and<br />

downloading the Station Equipment in both modes - locally and remotely- is also<br />

required to be provided by the tenderer.<br />

4.11 Testing in Lab. :<br />

4.11.1 The testing & demonstration <strong>of</strong> Lab Model shall be carried out by the<br />

vendor to the RDSO team at their premises or lab or at RDSO where two<br />

Loco and Stationary equipments shall be exchanging in<strong>for</strong>mation at RF<br />

Level through antennae.<br />

4.11.2 A Simulator shall be used <strong>for</strong> demonstration and testing which shall have<br />

provision only <strong>of</strong> receiving the transmissions made by various Loco and<br />

Stationary units. All the real-time communication between various Loco<br />

and Stationary TCAS units shall be captured and logged by Simulator with<br />

facility <strong>of</strong> real-time and <strong>of</strong>fline display <strong>of</strong> raw data, interpretable<br />

presentation through fields decoded from communication packets and<br />

functional GUI display alongwith configuration parameter settings, analysis<br />

summary, generation <strong>of</strong> exceptions and Statistics.<br />

4.11.3 The speedometer in<strong>for</strong>mation shall be fed to the Loco Equipment model<br />

through a simulator. The output <strong>of</strong> Brake Interface Unit shall also be<br />

demonstrated by physical operation <strong>of</strong> solenoid valves to control venting <strong>of</strong><br />

air in case <strong>of</strong> Air-Vent type BIU. The movement <strong>of</strong> train shall be simulated<br />

through physical swiping <strong>of</strong> RFID Tags across the RFID Reader <strong>of</strong> the<br />

Loco Lab Model and GPS Receiver Simulator application. The Speed<br />

in<strong>for</strong>mation shall be through Tachometer output simulator in <strong>for</strong>m <strong>of</strong> Pulse<br />

Generator. For simulating interface with interlocking, a switch panel shall<br />

be used.<br />

4.11.4 The changes in<strong>for</strong>med by RDSO Committee shall be complied, tested along<br />

with submission <strong>of</strong> compliance and testing report be<strong>for</strong>e the system is<br />

deployed in the field <strong>for</strong> further demonstration.<br />

4.12 Testing in Field :<br />

4.12.1 The testing & demonstration <strong>of</strong> field system shall be carried out by tenderer<br />

to RDSO team in the nominated section. All the real-time communication<br />

received by TCAS system shall be captured and logged by Simulator with<br />

facility <strong>of</strong> real-time and <strong>of</strong>fline display <strong>of</strong> raw data, interpretable<br />