- Page 1 and 2: GOVERNMENT OF INDIA MINISTRY OF RAI
- Page 3: 7.0 Tenderers can download and use
- Page 7 and 8: INSTRUCTIONS TO TENDERERS: 0100. GE
- Page 9 and 10: 0500. QUALIFYING REQUIREMENTS OF TE
- Page 11 and 12: III. Technical and commercial Bid f
- Page 13 and 14: destination rates unless the tender
- Page 15 and 16: himself with existing conditions on
- Page 17 and 18: 2211 A list of Test and Measuring I
- Page 19 and 20: INDIAN RAILWAYS STANDARD CONDITIONS
- Page 21 and 22: addressed to the Contractor shall b
- Page 23 and 24: 0606. The Contract Performance Guar
- Page 25 and 26: of a similar description (when stor
- Page 27 and 28: The contractor shall, if so require
- Page 29 and 30: The standard payment terms subject
- Page 31 and 32: The contractor shall perform the co
- Page 33 and 34: The prices stated are to include al
- Page 35 and 36: Contractor, or by any one employed
- Page 37 and 38: 3101. The Contractor should take al
- Page 39 and 40: To The President of India Acting th
- Page 41 and 42: Page 1 of 1 ANNEXURE-2 PROFORMA FOR
- Page 43 and 44: PROFORMA FOR AUTHORITY FROM MANUFAC
- Page 45 and 46: PROFORMA FOR STATEMENT OF DEVIATION
- Page 47 and 48: To PROFORMA OF BANK GUARANTEE FOR C
- Page 49 and 50: To PROFORMA OF BANK GUARANTEE FOR 1
- Page 51 and 52: PROFORMA BANK GUARANTEE FOR BID GUA
- Page 53 and 54: Annexure -11 CHECK LIST 1. Have you
- Page 55 and 56:
G1.00 Law governing the contract:-
- Page 57 and 58:
G15.00 Provisions of Contract labou
- Page 59 and 60:
of the Contractor or any of his emp
- Page 61 and 62:
ISO 9001: 2008 Effective from 18.06
- Page 63 and 64:
ISO 9001: 2008 Effective from 18.06
- Page 65 and 66:
ISO 9001: 2008 Effective from 18.06
- Page 67 and 68:
ISO 9001: 2008 Effective from 18.06
- Page 69 and 70:
ISO 9001: 2008 Effective from 18.06
- Page 71 and 72:
ISO 9001: 2008 Effective from 18.06
- Page 73 and 74:
ISO 9001: 2008 Effective from 18.06
- Page 75 and 76:
ISO 9001: 2008 Effective from 18.06
- Page 77 and 78:
ISO 9001: 2008 Effective from 18.06
- Page 79 and 80:
ISO 9001: 2008 Effective from 18.06
- Page 81 and 82:
ISO 9001: 2008 Effective from 18.06
- Page 83 and 84:
ISO 9001: 2008 Effective from 18.06
- Page 85 and 86:
ISO 9001: 2008 Effective from 18.06
- Page 87 and 88:
ISO 9001: 2008 Effective from 18.06
- Page 89 and 90:
ISO 9001: 2008 Effective from 18.06
- Page 91 and 92:
ISO 9001: 2008 Effective from 18.06
- Page 93 and 94:
ISO 9001: 2008 Effective from 18.06
- Page 95 and 96:
ISO 9001: 2008 Effective from 18.06
- Page 97 and 98:
ISO 9001: 2008 Effective from 18.06
- Page 99 and 100:
ISO 9001: 2008 Effective from 18.06
- Page 101 and 102:
ISO 9001: 2008 Effective from 18.06
- Page 103 and 104:
ISO 9001: 2008 Effective from 18.06
- Page 105 and 106:
ISO 9001: 2008 Effective from 18.06
- Page 107 and 108:
ISO 9001: 2008 Effective from 18.06
- Page 109 and 110:
ISO 9001: 2008 Effective from 18.06
- Page 111 and 112:
ISO 9001: 2008 Effective from 18.06
- Page 113 and 114:
ISO 9001: 2008 Effective from 18.06
- Page 115 and 116:
ISO 9001: 2008 Effective from 18.06
- Page 117 and 118:
GOVERNMENT OF INDIA MINISTRY OF RAI
- Page 119 and 120:
0. Preamble: 0.1 It is proposed to
- Page 121 and 122:
1.5.4 The development of the equipm
- Page 123 and 124:
and generate brake curve based on t
- Page 125 and 126:
2. Qualifying Requirements of Tende
- Page 127 and 128:
SN Description 1 Tenderer is manufa
- Page 129 and 130:
SN Description (x) Handling of RF R
- Page 131 and 132:
discretion at the time during the 5
- Page 133 and 134:
4.1.1 Contract Package A (Approx. 5
- Page 135 and 136:
presentation through fields decoded
- Page 137 and 138:
and Vikarabad) in such a way that t
- Page 139 and 140:
4.27.2.1 For On-Board Equipments i.
- Page 141 and 142:
S. Description Section On board No.
- Page 143 and 144:
8.4 If it becomes necessary for the
- Page 145 and 146:
15. SUPPLY AND CUSTODY OF MATERIAL
- Page 147 and 148:
account of another vendor not being
- Page 149 and 150:
Page 32 of 72 of Part-II Sec-II
- Page 151 and 152:
Contract Package A : Wadi (Excludin
- Page 153 and 154:
Contract Package A : Wadi (Excludin
- Page 155 and 156:
Contract Package A : Wadi (Excludin
- Page 157 and 158:
Contract Package A : Wadi (Excludin
- Page 159 and 160:
Contract Package A : Wadi (Excludin
- Page 161 and 162:
Contract Package A : Wadi (Excludin
- Page 163 and 164:
Contract Package A : Wadi (Excludin
- Page 165 and 166:
Contract Package A : Wadi (Excludin
- Page 167 and 168:
Contract Package B : Sadashivpet Ro
- Page 169 and 170:
Contract Package B : Sadashivpet Ro
- Page 171 and 172:
Contract Package B : Sadashivpet Ro
- Page 173 and 174:
Contract Package B : Sadashivpet Ro
- Page 175 and 176:
Contract Package C : Chitigidda (Ex
- Page 177 and 178:
Contract Package C : Chitigidda (Ex
- Page 179 and 180:
Part-II Sec.-II Annexure-1: Self As
- Page 181 and 182:
SN Description (x) Handling of RF R
- Page 183 and 184:
S. No. Item P.5 Supply of complete
- Page 185 and 186:
S. No. Item Q.1 Installation & comm
- Page 187 and 188:
S. No. Item Unit Qty of Contract Pa
- Page 189:
S. No. Item S.9 Supply, Installatio