03.08.2013 Views

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ISO 9001: 2008 Effective from 18.06.2012 RDSO/SPN/196/2012 Version 3.1.1<br />

Document Title : Specification <strong>of</strong> <strong>Train</strong> <strong>Collision</strong> <strong>Avoidance</strong> <strong>System</strong><br />

considered by the Loco unit <strong>of</strong> other trains approaching either from front or<br />

rear side <strong>of</strong> the said train.<br />

5.4.2 The traffic direction shall normally be determined through RFID, It shall be<br />

determined through GPS receiver on startup or restart or as fallback<br />

arrangement <strong>of</strong> RFID.<br />

5.4.3 The traffic direction shall be used <strong>for</strong> determining whether two trains are<br />

approaching, one following the other or going away from each other.<br />

5.4.4 The train direction shall be determined based on position <strong>of</strong> cab control. This<br />

direction shall be used <strong>for</strong> detecting Roll back/ <strong>for</strong>ward & Reverse movement.<br />

5.5 New <strong>Train</strong> Formation<br />

A train shall be considered as a new <strong>for</strong>med train by loco TCAS under one or<br />

more <strong>of</strong> the following situations:<br />

(i) When loco unit has been switched on or restarted;<br />

(ii) When loco unit has come out <strong>of</strong> Banking/ Coupled mode ;<br />

(iii) When direction <strong>of</strong> movement <strong>of</strong> loco has changed in station section;<br />

(iv) When length <strong>of</strong> the train has changed by more than 10 meters.<br />

5.6 <strong>Train</strong> Length Assignment<br />

5.6.1 Loco unit shall assume a default train length under one or more <strong>of</strong> the<br />

following situations:<br />

(i) When Loco unit has been switched on or restarted;<br />

(ii) When Loco unit has come out <strong>of</strong> Banking/ Multiple mode;<br />

(iii) When direction <strong>of</strong> loco movement has changed in station section;<br />

5.6.2 The default train length shall be 700m which shall be configurable at the<br />

installation stage.<br />

5.6.3 Every station unit shall monitor the status <strong>of</strong> track circuits identified <strong>for</strong><br />

measurement <strong>of</strong> train length either <strong>for</strong> the stopping train or <strong>for</strong> the train with<br />

default train length. Station unit shall communicate the location <strong>of</strong> boundary <strong>of</strong><br />

Track Circuit, time <strong>of</strong> occupied & clear status <strong>of</strong> these track to each Loco unit<br />

which is not in Multiple or Coupled mode. Loco unit, based on its location at<br />

the timings so received, shall calculate its train length.<br />

5.6.4 The train length so calculated by Loco unit shall be stored by it replacing the<br />

previously stored train length with time stamp under one or more <strong>of</strong> the<br />

following conditions:<br />

(i) If the previous train length was default train length;<br />

(ii) After stopping at a station, if the train length calculated by Loco unit<br />

differs the previously stored train length by more than 10m. This<br />

difference in train length shall be user programmable.<br />

5.6.5 The accuracy <strong>of</strong> the train length measurement by Station unit shall be within ±<br />

5 meters.<br />

5.6.6 Based on the train length calculated by Loco unit, it shall also correctly detect<br />

whether the train is a Light Engine or not. In case the train is detected as Light<br />

Engine, Loco unit in association with BIU shall also apply with higher BC<br />

pressure corresponding to loco independent brake in addition to NB/SB/EB.<br />

5.6.7 Station unit shall have provision <strong>of</strong> programming time correction value which<br />

shall be used by it <strong>for</strong> correcting the time <strong>of</strong> clear status <strong>of</strong> track circuit<br />

referred in5.6.3.<br />

5.6.8 Station unit shall also have provision <strong>for</strong> programming a maximum period <strong>of</strong><br />

track circuits referred in Clause 5.6.3, remaining occupied to differentiate<br />

occupation <strong>of</strong> these track circuits by train or due to failure. If occupation period<br />

<strong>of</strong> these track circuits is beyond the defined period <strong>of</strong> time, Station unit shall<br />

not transmit the timings <strong>for</strong> calculation <strong>of</strong> train length.<br />

5.6.9 On not receiving the timing in<strong>for</strong>mation from Station unit even upto 1 minute <strong>of</strong><br />

its entry into block section, Loco unit shall seek acknowledgement from the<br />

Loco Pilot in token <strong>of</strong> assurance that the train composition & hence the train<br />

length has not changed nor new train has been <strong>for</strong>med at this station. In case<br />

Signal Directorate RDSO/Lucknow Page 16 <strong>of</strong> 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!