03.08.2013 Views

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

Tender invited for Development of Train Collision Avoidance System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.27.2.5 Quality Assurance Manual <strong>of</strong> the OEM<br />

4.27.2.6 Details <strong>of</strong> test accessories, test and measuring instruments required. Test facilities<br />

required <strong>for</strong> the installation, testing & commissioning and maintenance <strong>of</strong> the<br />

system.<br />

4.27.2.7 A list <strong>of</strong> all cards/Modules used in each set system<br />

4.27.2.8 Typical testing sheets and detailed testing procedures<br />

4.27.2.9 Successful <strong>Tender</strong>er shall supply all documents as per RDSO specification<br />

RSDO/SPN/196/2012 Version 3.1.1 with latest amendments/ Version.<br />

4.27.2.10 Pre-Commissioning Checklist<br />

4.27.2.11 Diagnostic Procedure including troubleshooting<br />

4.27.2.12 User manual with Do’s and Don’ts<br />

4.27.2.13 Any other documents required by Railways <strong>for</strong> the normal operation &<br />

maintenance<br />

4.27.2.14 <strong>System</strong> Requirement Specification to address multi-vendor interoperability so<br />

that it should be possible to inter-operate Loco TCAS Equipment, Stationary<br />

TCAS Equipment and Track-mounted TCAS equipment <strong>of</strong> different vendors /<br />

tenderers with full Compatibility<br />

4.27.2.15 All the Test Log, Raw Data in <strong>for</strong>m <strong>of</strong> s<strong>of</strong>tcopy and interpretable data in s<strong>of</strong>tcopy<br />

and hardcopy, shall be provided to RDSO immediately after each trial session.<br />

4.28 The Contract Package-wise details are as under:<br />

Broad details are given as under. Further details are mentioned in Schedule <strong>of</strong><br />

Requirements.<br />

S. Description Section On board<br />

No.<br />

a) Contract Package<br />

– A<br />

Design and<br />

<strong>Development</strong> <strong>of</strong><br />

<strong>Train</strong> <strong>Collision</strong><br />

<strong>Avoidance</strong> <strong>System</strong><br />

(TCAS) on<br />

Sadashivpet Road –<br />

Viakarabad –<br />

Chitgidda – Wadi<br />

(Excluding) section<br />

<strong>of</strong> Secunderabad<br />

Division<br />

Sadashivpet Road<br />

LC 9 (between Sadashivpet Road – Vikarabad)<br />

LC 4 (between Sadashivpet Road – Vikarabad)<br />

IB (between Vikarabad – Chitgidda)<br />

Chitgidda<br />

Vikarabad<br />

Godamgura<br />

IB (between Godamgura - Dharur)<br />

Dharur<br />

Rukmapur<br />

IB (between Rukmapur - Tandur)<br />

Tandur<br />

Mantatti<br />

Nawandgi<br />

Kurugunta<br />

Seram<br />

IB (between Serum – Malkhaid Road)<br />

Malkhaid Road<br />

IB (between Malkhaid Road and Chittapur)<br />

Chittiapur<br />

Sulehali<br />

Wadi (Excluding)<br />

<strong>System</strong>s<br />

Locomotives<br />

:<br />

20<br />

Page 23 <strong>of</strong> 72 <strong>of</strong> Part-II Sec-II

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!