18.06.2014 Views

Evaluation of Integrated Coastal Zone Management (ICZM) in ...

Evaluation of Integrated Coastal Zone Management (ICZM) in ...

Evaluation of Integrated Coastal Zone Management (ICZM) in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Evaluation</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Coastal</strong> <strong>Zone</strong> <strong>Management</strong> (<strong>ICZM</strong>) <strong>in</strong> Europe – F<strong>in</strong>al Report<br />

processes), 7 (<strong>in</strong>volv<strong>in</strong>g all relevant adm<strong>in</strong>istrative bodies) and 8<br />

(develop<strong>in</strong>g a balanced comb<strong>in</strong>ation <strong>of</strong> <strong>in</strong>struments <strong>in</strong> plann<strong>in</strong>g and<br />

management). Particularly with respect to these pr<strong>in</strong>ciples further<br />

guidance is needed.<br />

Table 16: Observ<strong>in</strong>g the Pr<strong>in</strong>ciples <strong>of</strong> Good <strong>ICZM</strong> <strong>in</strong> the Mediterranean<br />

Pr<strong>in</strong>ciples <strong>of</strong> Good<br />

<strong>ICZM</strong><br />

1) Is there a holistic<br />

thematic and<br />

geographic perspective<br />

<strong>in</strong> the process?<br />

2) Is there a long-term<br />

perspective<br />

envisaged?<br />

3) Is an adaptive<br />

management approach<br />

applied dur<strong>in</strong>g a<br />

gradual process?<br />

4) Is the process localcontext<br />

specific?<br />

5) Does the <strong>ICZM</strong><br />

respect and work with<br />

natural processes?<br />

6) Is the process<br />

based on participatory<br />

plann<strong>in</strong>g and<br />

management?<br />

7) Does the process<br />

support and <strong>in</strong>volve all<br />

relevant adm<strong>in</strong>istrative<br />

bodies?<br />

8) Is there a balanced<br />

comb<strong>in</strong>ation <strong>of</strong><br />

<strong>in</strong>struments <strong>in</strong> plann<strong>in</strong>g<br />

and management?<br />

Croatia Cyprus France Greece Italy Malta Slovenia Spa<strong>in</strong> Turkey<br />

<br />

<br />

• <br />

<br />

• <br />

<br />

• <br />

• <br />

Level <strong>of</strong> Observance<br />

<br />

<br />

<br />

<br />

•<br />

Yes, fully :<br />

Partly fulfilled:<br />

Significant gaps<br />

Not fulfilled<br />

Insufficient<br />

<strong>in</strong>formation<br />

The pr<strong>in</strong>ciple is fully covered by the strategy/equivalent and <strong>in</strong> place (or close to).<br />

Essential aspects <strong>of</strong> the pr<strong>in</strong>ciple are covered by the strategy/equivalent and <strong>in</strong> place.<br />

Serious <strong>in</strong>itiatives for implementation are taken or foreseen.<br />

Only some aspects <strong>of</strong> the pr<strong>in</strong>ciple are covered or implementation is foreseen.<br />

The pr<strong>in</strong>ciple is not or only marg<strong>in</strong>ally covered.<br />

Insufficient <strong>in</strong>formation available for assessment<br />

The scor<strong>in</strong>g method is expla<strong>in</strong>ed <strong>in</strong> chapter 3 <strong>of</strong> this Report.<br />

18 August 2006 157

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!