18.06.2014 Views

Evaluation of Integrated Coastal Zone Management (ICZM) in ...

Evaluation of Integrated Coastal Zone Management (ICZM) in ...

Evaluation of Integrated Coastal Zone Management (ICZM) in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Assessment<br />

5.1 Identify<strong>in</strong>g success and fail factors underly<strong>in</strong>g progress <strong>of</strong> <strong>ICZM</strong> <strong>in</strong> the country by us<strong>in</strong>g the<br />

8 pr<strong>in</strong>ciples <strong>of</strong> good <strong>ICZM</strong> (EQ2a, EQ4)<br />

1) Is there a holistic thematic and geographic perspective <strong>in</strong> the process?<br />

2) Is there a long-term perspective envisaged?<br />

3) Is an adaptive management approach applied dur<strong>in</strong>g a gradual process?<br />

4) Is the process local-context specific?<br />

5) Does the <strong>ICZM</strong> respect and work with natural processes?<br />

6) Is the process based on participatory plann<strong>in</strong>g and management?<br />

7) Does the process support and <strong>in</strong>volve all relevant adm<strong>in</strong>istrative bodies?<br />

8) Is there a balanced comb<strong>in</strong>ation <strong>of</strong> <strong>in</strong>struments <strong>in</strong> plann<strong>in</strong>g and management?<br />

Explanations for the 8 pr<strong>in</strong>ciples <strong>in</strong> 5.1:<br />

ref pr<strong>in</strong>ciple 1 : Are neighbour<strong>in</strong>g areas and themes considered? Are there a m<strong>in</strong>imum number <strong>of</strong><br />

sectors and levels <strong>in</strong>volved <strong>in</strong> the process? In case <strong>of</strong> low scor<strong>in</strong>g, what are the reasons?<br />

ref pr<strong>in</strong>ciple 2: What is the time horizon for the country's <strong>ICZM</strong> strategy compared to the LOICZ<br />

strategy (50 years+)? Are the needs <strong>of</strong> current and future generations considered? Are longterm<br />

changes such as climate change, sea level rise considered and <strong>in</strong>creas<strong>in</strong>g frequency and<br />

violence <strong>of</strong> storms? Are measures based on a precautionary approach?<br />

ref pr<strong>in</strong>ciple 3: Is plann<strong>in</strong>g perceived as an iterative process? Are monitor<strong>in</strong>g loops foreseen to redirect<br />

implementation? Has an accompany<strong>in</strong>g programme been set up to collect relevant ecological,<br />

economic and social <strong>in</strong>formation to assist the further evolution <strong>of</strong> <strong>ICZM</strong>? What is the data availability<br />

policy? Are their any restrictions to the access <strong>of</strong> the collected data?<br />

ref pr<strong>in</strong>ciple 4: Are different segments <strong>of</strong> the national coastal zone identified with respect to specific<br />

challenges and responses? Are local governments and coastal communities adequately considered?<br />

Have appropriate coastal protection measures been taken <strong>in</strong>clud<strong>in</strong>g the protection <strong>of</strong><br />

coastal settlements and their cultural heritage?<br />

ref pr<strong>in</strong>ciple 5: Have measures been taken to estimate the carry<strong>in</strong>g capacity <strong>of</strong> the coastal zone?<br />

Are there examples <strong>of</strong> renaturation measures, e.g. flood retention bas<strong>in</strong>s, overflow bas<strong>in</strong>s?<br />

ref pr<strong>in</strong>ciple 6: Are the relevant stakeholders adequately <strong>in</strong>volved:<br />

- <strong>Coastal</strong> zone residents?<br />

- Local, regional and national governments?<br />

- Non-governmental organisations?<br />

- Private bus<strong>in</strong>ess sector?<br />

Is an adequate proportion <strong>of</strong> coastal land accessible to the public, both for recreational and<br />

aesthetic reasons?<br />

What k<strong>in</strong>d <strong>of</strong> mechanisms have been implemented to ensure participation and <strong>in</strong>tegration<br />

<strong>of</strong> stakeholders (e.g. workshops, forums, hear<strong>in</strong>gs, consultations, <strong>in</strong>terviews, websites, flyers,<br />

submission <strong>of</strong> compla<strong>in</strong>ts, public display <strong>of</strong> plans)?<br />

ref pr<strong>in</strong>ciple 7: Are local regional and national governments <strong>in</strong>volved? Have communication l<strong>in</strong>ks<br />

been established for improved horizontal and vertical coord<strong>in</strong>ation?)<br />

28 February 2006 Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!