29.08.2014 Views

Railway Reform: Toolkit for Improving Rail Sector Performance - ppiaf

Railway Reform: Toolkit for Improving Rail Sector Performance - ppiaf

Railway Reform: Toolkit for Improving Rail Sector Performance - ppiaf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong><strong>Rail</strong>way</strong> <strong>Re<strong>for</strong>m</strong>: <strong>Toolkit</strong> <strong>for</strong> <strong>Improving</strong> <strong>Rail</strong> <strong>Sector</strong> Per<strong>for</strong>mance<br />

Annex 4: Concession Contract Guide<br />

• Assisting in obtaining temporary and permanent import licenses <strong>for</strong> material<br />

and <strong>for</strong> equipment, and immigration consents <strong>for</strong> key personnel;<br />

• Working with the Concessionaire to identify staff to be transferred to the<br />

Concessionaire and dealing with issues arising from staff not to be transferred;<br />

• Transferring to the Concessionaire the necessary rights in the Concessioned<br />

Assets both in their entirety and punctually; and<br />

• Where appropriate, entering into an intercreditor agreement referred to in<br />

section 2.11 and a Direct Agreement with the Concessionaire and Senior<br />

Lenders.<br />

The role of the Authority after Term commencement, and to a degree be<strong>for</strong>e, may<br />

include the following:<br />

• Paying any service payments or other payments to be made under the Concession<br />

Agreement whether of a capital or revenue nature and allowing adjustments<br />

in accordance with the Agreement <strong>for</strong> inflation and, where relevant,<br />

currency fluctuations;<br />

• Reviewing and commenting on any changes (Variations) to Concessionaire<br />

designs and construction proposals as they are developed; this should not be<br />

confused with the continuing role of the Independent Engineer;<br />

• Reviewing and commenting on Concessionaire maintenance, renewal, and<br />

operational procedures, to the extent these are not addressed within the role<br />

of the <strong>Rail</strong> Safety Board and the Transport Regulatory Commission;<br />

• Viewing and observing tests of any equipment being developed;<br />

• Administering the agreed process <strong>for</strong> the Concessionaire or Authority to propose<br />

and implement changes to output requirements, constraints on inputs,<br />

or Concessionaire proposals, to the extent these are not addressed within the<br />

role of the <strong>Rail</strong> Safety Board and the Transport Regulatory Commission;<br />

• Accessing management in<strong>for</strong>mation to ensure the delivery timetable is on<br />

track and any overriding safety issues are being satisfactorily addressed, depending<br />

on the scope of Authority exposure to the scheme. This may include<br />

access to the site and places of manufacture; rights of access that should extend<br />

to the Independent Engineer.<br />

Principles outlined in this section 2.10 reflect an intention to ensure appropriate<br />

risk transfer during the period leading up to the commissioning of the New Upgrades<br />

and beyond.<br />

2.11 Concession Fees<br />

The World Bank Page 256