2.<br />

DOCUMENTATION<br />

Documentation<br />

2.1 Drawings<br />

Unless approved by the Client, all drawings shall be prepared using AutoCAD or an approved<br />

computer aided drafting (CAD) package. All drawings shall be A3 size<br />

CAD files of all the Contract Drawings will be provided to the Contractor / Supplier upon receipt of<br />

the Contractor's / Suppliers written request.<br />

Electrical wiring and circuit diagrams shall be neat, clear, un-crowded and shall show all equipment<br />

using standard symbols. All electrical equipment wiring and terminals shall be numbered in<br />

accordance with the Specification requirements.<br />

2.2 Project Manuals<br />

The Contractor / Supplier shall supply manuals for the operation and maintenance of all electrical<br />

and instrumentation and control systems supplied under the Contract. In addition, the Contractor<br />

shall provide comprehensive manuals, which detail the programming and configuration of any<br />

programmable systems.<br />

The Contractor / Supplier shall also provide an electronic copy of the manual.<br />

In general, sufficient information shall be provided to enable the plant's operations and maintenance<br />

personnel to understand the function of all equipment and its components and to correctly perform<br />

the required operation and maintenance.<br />

2.3 Factory Testing & Commissioning Test Sheets<br />

Contractor / Supplier shall prepare detailed check sheets to record each phase and item of testing<br />

and commissioning as required by the Client.<br />

The check sheets shall include separate items for each test and check of each input/output; and<br />

each step and sequence of functional operation. Each item on the check sheets shall have provision<br />

for recording the date of the activity and name and signature of the Contractor's personnel who<br />

carried out the activity.<br />