<strong>TRP</strong> Work Plan 2005-2007<br />

Complete List of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

6.- Generic Technologies and Techniques<br />

6.22 - Components<br />

IPC<br />

Appr.<br />

<strong>TRP</strong> Ref. Title Budget (K€) PP C'try Remarks<br />

SW Clause<br />

applicability<br />

Status as of Contract<br />

2004 2005 2006 2007 2008 31/12/2008<br />

Y2003<br />

03/QCT-00<br />

1<br />

Evaluation Thermistors 125 DN/S IRL Beatherm - Contracted 17827<br />

Y2001 GAD 1.01<br />

Process Development And Concept Validation Of Metamorphic High Electron<br />

Mobility Transistor Ph.2<br />

Deferred (low priority, 200kE) - Deferred<br />

Y2001<br />

GAD 2.06<br />

A<br />

Design And Evaluation Initiative For Rad Tolerant Components 600 DN/S F STM - Intended<br />

Y2001<br />

GAD 2.06<br />

C<br />

Reliability Assessment Of European Power Mosfets Phase 1 And 2 C(1) Deferred (low priority, 500kE) - Deferred<br />

Y2001<br />

GAD<br />

2.06.D<br />

Study Of RF Compression & Overdrive on Components 200 C - Intended<br />

Y2003 GAD 3.04 Testing of Chip Scale Package (CSP) 100 DN/S F Astrium - Contracted 14936<br />

Y2003 GAD 4.02 HDI demonstration Mo<strong>du</strong>le with CSP / ECR32 MCM Validation 150 DN/S F Astrium - Contracted 14936<br />

Y2003 QCA-004 Utilisation of the Proton Irradiation Facility (PIF) for Components Studies 550 DN/C CH PSI - Contracted 18465<br />