30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

mission profile, orbit) and in line with relevant CCSDS standards<br />

• Identification of the most suitable system configuration and architecture for selected applications/scenarios<br />

• Identification and selection of commercial/in<strong>du</strong>strial optical wireless communications systems (protocols, components)<br />

• Performance/reliability assessment of technology, components and devices<br />

• Assessment of Qualification for components and devices<br />

• Evaluation and characterization of Opto-electronic equipment/component and their interfaces<br />

• Selection of a Test application case from the preliminary set of applications scenarios to be used as System demonstrator<br />

• Definition of a Flight Test Demonstration based on the above<br />

• Preliminary design of the optical wireless communication system<br />

• Critical component and subassembly design and developments such as fast IR repeater<br />

• Development of Software tools for system analysis optimisation and computer aided design (link budget…)<br />

• Development of communication protocol and interface layers for selected configurations, operation and test environment<br />

software<br />

• Integration and Test of the Elegant bread-board of complete optical wireless systems for the selected applications<br />

• Consolidated technology road map and proposal for a flight demonstration based on the demonstration system.<br />

Deliverables:<br />

Technical datapackage. Elegant BB.<br />

Current TRL:<br />

Target TRL: TRL3-4 Application Need/Date:<br />

TRL3<br />

TRL5 by 2009<br />

(PH2)<br />

Application/Mission:<br />

Contract Duration:<br />

SW Clause : - Dossier0 Ref.: T-7756<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: 97/WSP01<br />

Title: Fast Transform DSP Coproc Ph. 2 & 3<br />

Floating point data representation is not a requirement for some applications and a performance increase about one order of<br />

magnitude w.r.t the ADSP21020 can be achieved by using a fixed-point co-processor. This is particularly true for small block<br />

size FFts, FIR filters and transforms in general. A configurable device with multiple parallel ALUs shall be developed in the<br />

frame of this activity. The ASIC will be very suitable as a stand alone computing unit for low level processing or as an<br />

accelerator when coupled to the ADSP21020.<br />

Deliverables:<br />

Technical data package. Breadboard.<br />

Current TRL: TRL2-3 Target TRL: TRL5/6 Application Need/Date: TRL5/6 by 2008<br />

Application/Mission: RF instruments e.g. SAR, altimeters Contract Duration: 24 months<br />

SW Clause : - Dossier0 Ref.: T-7798<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 122 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!