30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

3.2 - Automation and advanced robotic technologies<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T302-02MM<br />

Compact Automatic Tool Exchange Device<br />

Deliverables:<br />

Current TRL: TRL1 Target TRL: TRL3 Application Need/Date: TRL5 by 2010-2012<br />

Application/Mission: exploration missions Contract Duration: 24 months<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: T302-08MM<br />

Title:<br />

Vision Based Manipulation of non-co-operative objects<br />

Non-cooperative objects, in conventional robotics terms, are those which do not provide help to robotics means to ease their<br />

manipulation. In the case of robotics vision, this definition applies to objects not equipped with optical markers. This activity<br />

shall develop a concept of the software/hardware to allow a robot system equipped with a stereo camera sensor to<br />

operate-on/manipulate human-made non cooperative objects. This shall allow real time visual serving control of robot motion<br />

directly into the sensor frame. The activity shall also develop concepts for robust techniques to overcome the problems<br />

created by the extreme lighting conditions typical of orbital applications.<br />

Deliverables:<br />

Breadboard including Vision based manipulation software and hardware, Calibration and test equipment for the software.<br />

Current TRL: TRL1 Target TRL: TRL3 Application Need/Date: TRL5 by 2010-2012<br />

Application/Mission: exploration missions Contract Duration: 18 months<br />

SW Clause : - Dossier0 Ref.: T-6<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 59 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!