30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T505-09MP<br />

Hall-effect Thruster with Multi-Sectional Con<strong>du</strong>ctive Walls<br />

An interesting approach to enhance HET efficiency consists in an innovative discharge channel architecture based on<br />

segmented con<strong>du</strong>cting walls. A variable channel width can contribute to decrease the ion losses at the walls and improve the<br />

ion flow focusing (re<strong>du</strong>cing erosion and sputtering problems), while the use of con<strong>du</strong>ctive materials with low secondary<br />

electron emission yield (with respect to more traditional ceramic insulators) can lead to significant increases of thruster<br />

efficiency (up to 80%, especially for high discharge voltages). The Contractor shall design a high-power HET with a<br />

multi-segmented (at least three) con<strong>du</strong>ctive channel. In addition, the Contractor shall improve the control of the potential along<br />

the channel, either by changing the relative position of the con<strong>du</strong>ctive floating sections to the distribution of the magnetic field,<br />

or by imposing with external power supplies their electric potential. This can contribute to re<strong>du</strong>ce the beam divergence and the<br />

near-wall potential drop, responsible for channel sputtering and erosion. The Contractor shall also incorporate a mo<strong>du</strong>lar<br />

magnetic system to be able to optimise the magnetic configuration. The Contractor shall manufacture a prototype a perform a<br />

complete characterisation test campaign and determine the operational limits of the technology. The Contractor shall<br />

instrument the test facility to be able to quantify the decrease of erosion with respect to standard discharge channels.<br />

Deliverables:<br />

Functional Design Assessment and Justification Report. Design <strong>document</strong> for a high-power HET with multi-segmented<br />

con<strong>du</strong>ctive channel. Demonstrator Characterisation.<br />

Current TRL: TRL1 Target TRL: TRL2 Application Need/Date: TRL5 >2009<br />

High power telecommunication missions<br />

(>2012) and interplanetary missions for<br />

Application/Mission:<br />

Exploration and science (>2012) will be<br />

Contract Duration: 24 months<br />

the main objectives for this technology.<br />

SW Clause : - Dossier0 Ref.: T-8119<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: T601-02MP<br />

Title:<br />

Development of advanced EP Thruster characterisation diagnostics<br />

The objectives of the proposed activity are to develop and test Telemicroscopy and Thermographic diagnostic systems<br />

capable of being used for both Hall-effect oftware and Gridded ion engine systems operating with variable Isp and<br />

propellants. In addition to the diagnostics analysis techniques/software tools are also required for the interpretation of test<br />

data. This activity will be accomplished in two phases: Phase 1: Design and development of diagnostics; telemicroscopy<br />

diagnostic design and demonstrator manufacture; thermographic diagnostic design and demonstrator manufacture;<br />

Development of data analysis techniques/SW. Phase 2: Experimental characterisation of HET and Gridded thrusters;<br />

Experimental characterisation of HET/GIE Software in number of European facilities; Analysis of results and comparison<br />

between facilities.<br />

Deliverables:<br />

Advanced diagnostic systems and tools ready to be used in European EP test facilities.<br />

Current TRL: TRL2 Target TRL: TRL3 Application Need/Date: TRL5 >2009<br />

Application/Mission: All missions using EP thrusters Contract Duration: 18 months<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 196 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!