30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

6.11 - Mission Analysis & Space Debris<br />

<strong>TRP</strong> Reference: T605-08GA<br />

Title:<br />

Astro-toolbox: a toolbox for preliminary mission analysis<br />

This study aims at the definition of the required tools for preliminary mission analysis and design. It will be necessary a<br />

trade-off between the level of accuracy for a preliminary assessment and the computing time required. The study will also<br />

include an implementation of the defined methodology and approaches into a mo<strong>du</strong>lar software code and a verification of the<br />

Astro-toolbox on a number of selected test cases. The definition of the tools is necessary to identify all typical problems that a<br />

mission analyst commonly may encounter <strong>du</strong>ring a preliminary design (spiralling trajectories, multiple swing-bys, launch<br />

windows, orbit maintenance, HALO orbits,etc). The trade-off is necessary to define the most appropriate approaches and<br />

solution methods for the identified problems. The result obtained by each mo<strong>du</strong>le must be reliable (within a certain tolerance)<br />

even in case of quick assessment. The maximum error (or the tolerance) allowed for a preliminary study must be defined in<br />

relation to the computational effort. Due to the nature of the toolbox, and the required mo<strong>du</strong>larity, it is recommended to use<br />

Matlab (or equivalent) as programming language and development environment. Interface with other systems (excel, STK,etc)<br />

must be provided in form of appropriate output and input data format. A graphical interface is also required to help in the<br />

design and visualisation of the results.<br />

Deliverables:<br />

Technical Report, Demonstration Software.<br />

Current TRL:<br />

Target TRL: Beta Application Need/Date:<br />

-<br />

version<br />

Application/Mission: Mission analysis Contract Duration: 12 months<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 179 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!