<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

1) Device test results, Calibrated channel temperature measurement approach that can be used within GREAT2.<br />

2) Calibrated device simulations; Recommendations on optimum device structures to concentrate development efforts.<br />

3) Identification of key parameters effecting reliability; Demonstration of materials growth and processing steps required to<br />

eliminate failure mechanisms; Discrete power transistor samples.<br />

4) Establishment of baseline GaN MMIC foundry process; Preliminary PID <strong>document</strong>ation, Reliability measurement data on<br />

test characterisation vehicles (TCV’s).<br />

5) Establishment of substrate and epitaxy specification criteria required for pro<strong>du</strong>ction transfer, implementation of fast and<br />

non-destructive analysis techniques, technical notes.<br />

Current TRL: TRL3 Target TRL: TRL4 Application Need/Date: TRL5/6 >2009<br />

Telecoms, EO, Navigation and Science<br />

Application/Mission: Contract Duration: 24 months<br />

payloads requiring HPA’s<br />

SW Clause : - Dossier0 Ref.: T-7826, T-7736<br />

Consistency with Harmonisation<br />

<strong>ESA</strong>/IPC(2006)89<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: T-M-QCT-02-MT<br />

Title:<br />

MTSL Lab<br />

Microelectronics Support Laboratory Frame contract (CCN).<br />

Deliverables:<br />

Technical notes,<br />

Current TRL: N/A Target TRL: N/A Application Need/Date: N/A<br />

Application/Mission: all missions Contract Duration: 60 months<br />

SW Clause : - Dossier0 Ref.: N/A<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T-S-QCA-02-08<br />

Utilisation of the Heavy-ion Irradiation Facility (HIF) for Components Studies<br />

The availability of the Heavy Ion Irradiation Facility has been demonstrated to be of paramount importance for <strong>ESA</strong> projects<br />

and the European Space in<strong>du</strong>stry as recently again proven by the urgent and successful SEE characterisation of 19 device<br />

types for the XMM project. <strong>ESA</strong>’s continuing support of HIF will remain an instrumental asset for the European Space effort.<br />

The objective of this activity is to maintain, upgrade and keep the HIF operational. To provide 240 hours of free beam time<br />

per year on a priority basis for the purpose of the <strong>ESA</strong> lead irradiation campaigns. Additionally, a minimum of 240 hours of<br />

beam time will be made available to <strong>ESA</strong> in<strong>du</strong>strial contractors, research institutes and other interested users. All campaigns<br />

are supported by a qualified physicist and control room staff. A minimum of eight campaigns shall be sche<strong>du</strong>led per year<br />

covering four 100-hour periods and four 24-hour periods, more or less evenly spread throughout the year.<br />

Deliverables:<br />

Tested samples. Technical note, test results.<br />

Current TRL: N/A Target TRL: N/A Application Need/Date: N/A<br />

Application/Mission: all missions Contract Duration: 60 months<br />

SW Clause : - Dossier0 Ref.: T-7637<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

N/A<br />

Page 222 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!