30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

3.5 - Free-Flyers (Rendezvous and Docking, In-Orbit Assembly and Servicing)<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T306-03MM<br />

Selfcalibrating 3-D optical metrology<br />

3-D imaging system has been developed that uses an interferometric technique to obtain range and profile information. The<br />

system is self-calibrating, once knowledge of the camera and projector are known, and can handle discontinuities. An<br />

improvement to the current system is proposed that would allow it to operate without a piezo stepper, allowing a significant<br />

mass saving. The objective of this work is to breadboard and test the new design. This follows from a concept studied under<br />

fast-track SME <strong>TRP</strong> initiative. Deliverables: Design, build and test of a self-calibrating, 3-D vision system breadboard. Analysis<br />

of system limitations as regards spatial and temporal resolution, field of view etc.<br />

Deliverables:<br />

Current TRL: Target TRL: Application Need/Date:<br />

Application/Mission:<br />

Contract Duration:<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 64 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!