30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

4.5 - Propulsion / Advanced Propulsion Concepts for In-Space Operations<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T404-02MP<br />

Technical Assessment for High Power Magneto Plasma Dynamics (MPD) Systems<br />

The proposed activity has the following main objectives: 1. Mission analysis, to investigate MPD mission possibilities and<br />

subsequent MPD system requirements. 2. Preliminary consideration of a MPD in the 110-300kW range, and critical areas<br />

identification (self applied and externally applied magnetic field solutions shall be studied and a trade-off shall be performed);<br />

lifetime issues and possible improvement/solution shall be considered. The physical phenomena shall be analysed and<br />

possible design analytical and mathematical models shall be used to evaluate impacts on the MPD system. A comparison<br />

between self applied and applied magnetic field should be done.3. MPD roadmap: research and development activities plan to<br />

achieve the maturity of the technology shall be done, together with the required time sche<strong>du</strong>le evaluation. The Aurora<br />

programme shall be taken into consideration as main driver.<br />

Deliverables:<br />

1. Mission analysis report. 2. 110-300kW MPD preliminary design report.3. MPD roadmap report.4. Final report<br />

Current TRL: TRL2 Target TRL: TRL2-3 Application Need/Date: TRL5 >2015<br />

Future high power platforms (exploration,<br />

Application/Mission: Contract Duration:<br />

etc.)<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Electric Propulsion<br />

Roadmap and Conclusions:<br />

18 months<br />

<strong>TRP</strong> Reference: T404-03MP<br />

Title:<br />

Advanced Electric Propulsion for a Service Mo<strong>du</strong>le for VEGA<br />

This activity includes the detailed assessment and preliminary design of a service mo<strong>du</strong>le using electric propulsion (EP) to be<br />

applied for LEO-MEO/LEO-GEO transfer orbits in order to increase payload capability of the Vega launcher. The service<br />

mo<strong>du</strong>le shall be equipped with independent AOCS, telecommunications system, autonomous navigation system (to re<strong>du</strong>ce<br />

cost of the ground segment). A set of orbital maneuvers (station keeping, GEO transfers and corrections on LEO) shall be<br />

guaranteed. EP technologies to be assessed for the mo<strong>du</strong>le are related to both classical EP (i.e. gridded ion engines,<br />

Hall-effect thrusters and other types of EP. After a trade-off on performance, configuration and mission capability, the mo<strong>du</strong>le<br />

shall be designed and a development plan shall be prepared. The detailed activities include: feasibility study of EP (applied to<br />

Vega), I/F’s requirements w.r.t the launcher, mo<strong>du</strong>le configuration study, key technologies evaluation, mission analysis,<br />

development & cost plans for B, C, D phases.<br />

Deliverables:<br />

Technical reports. Design file.<br />

Current TRL: - Target TRL: TRL1 Application Need/Date: TRL5 by 2012<br />

Application/Mission: Vega evolution. Contract Duration: 14 months<br />

SW Clause : - Dossier0 Ref.: T-7758<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 91 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!