<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T403-14MC<br />

Cryogenic Composite Tanks and Lines<br />

During FESTIP 1 and 2, a feasibility study was carried out to assess the possibility of replacing all-metal cryogenic fluid<br />

transfer lines for launchers, with composite lines with low mass and good thermal insulation properties. This feasibility study<br />

took as reference the Ariane 5 feed line dimension: inside diameter of 185mm, with the length limited to 1m. Different<br />

techniques to design and manufacture such items using composite materials concluded that there are two different ways, both<br />

using filament winding technique for composite components: Single wall piping -composite piping with a metallic barrier/liner to<br />

re<strong>du</strong>ce the gas diffusion at cryogenic temperature; Double walled, vacuum insulated cryogenic composite line, which further<br />

re<strong>du</strong>ces the heat leaks through the system. The goal of this activity is to further develop the technology for designing and<br />

manufacturing light-weight cryogenic tanks and lines based on composite technology. Substantial mass re<strong>du</strong>ction for<br />

cryo-tanks and lines is expected while at the same time the parasitic heat leaks will be re<strong>du</strong>ced thereby increasing the lifetime<br />

of cryogenic storage (stand-time).The following tasks are envisaged:- adapt/develop processes, proce<strong>du</strong>res (e.g. machining<br />

steps, welding) to pro<strong>du</strong>ce small diameter lines including fittings and connections as well as cryo-tanks- design and<br />

manufacture a cryo-tank with some appropriate cryo-lines- perform a complete thermal and mechanical test programme with<br />

the built H/W to derive e.g. stand-time, parasitic heat leak, leakage.<br />

Deliverables:<br />

Processes and proce<strong>du</strong>res to pro<strong>du</strong>ce light-weight cryo-tanks, lines and systems based on composite technology. H/W: fully<br />

tested (thermal and mechanical) cryo-tank and lines.<br />

Current TRL: TRL1-2 Target TRL: TRL4-5 Application Need/Date: TRL5 by 2010<br />

Space Missions (Science, Aurora, etc.)<br />

requiring cryogenic liquid storage<br />

(>=2009); Launcher, for launcher mass<br />

Application/Mission:<br />

re<strong>du</strong>ction by re<strong>du</strong>cing the mass of the<br />

Contract Duration: 30 months<br />

propellant tank and of the fluid feed lines<br />

(>=2010)<br />

SW Clause : - Dossier0 Ref.: T-8138, T-605, T-703<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 87 of 227