30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T603-36EC<br />

Future technology studies for APS Star Trackers<br />

The contractor shall investigate potential new star trackers technologies that may be of use in the future to further re<strong>du</strong>ce the<br />

cost while improving the robustness (dynamic conditions, straylight/blinding, false stars and radiation) and functionalities<br />

(sensing of moon or earth/asteroid/planet position for example, direct entry to tracking). These shall include the mandatory<br />

consideration of LCMS APS detector by Cypress (Fillfactory) -designed specifically for this purpose-, baffle construction<br />

materials, plastic lenses, black coatings, alternative construction techniques, single chip electronics (all processing in the<br />

same ASIC/FPGA), and wireless communication. In addition, the contractor shall be expected to propose further new<br />

technologies themselves. Technical evaluations shall be performed on each technology considered and all promising<br />

technologies breadboarded for further, more detailed, evaluation and, where appropriate, development plans to bring the<br />

technology to the correct maturity level shall be drawn up. The emphasis shall be on pro<strong>du</strong>ction cost lowering from a<br />

continued re<strong>du</strong>ction of the number of components, an easing of assembly, automated testing and cheaper construction<br />

techniques.<br />

Deliverables:<br />

Breadboards.<br />

Current TRL: TRL2 Target TRL: TRL4 Application Need/Date: TRL5 by 2010<br />

Application/Mission: All missions Contract Duration: 24 months<br />

SW Clause : - Dossier0 Ref.: T-7815<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 155 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!