<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T601-46MC<br />

Vibro-Acoustic Analysis & Test methods for Large Deployable Structures<br />

Classical rigid solar array vibro-acoustic modelling, analysis and test correlation has been developed up to a certain maturity,<br />

however such methods are not directly transferable to thin film structures, closely packed radiators, SAR antennas etc. and<br />

hence the vibro-acoustic FEM/BEM analysis, testing and their correlation of large-area light-weight structures need further<br />

development. The objective of this activity is to define a Finite Element and Boundary Element modelling methodology and<br />

tuning for mechanical loads applied to thin, flexible deployable structures, studying deterministic and random techniques,<br />

taking into account fluid structure interactions, non-linear behaviour, effect of thin airgaps, effect of membrane stretching etc;<br />

and the development of instrumentation techniques for subsystem vibration and acoustic testing. It will also include the testing<br />

and correlation of a full size structural model, representative of vibro-acoustic parameters. Several tasks have been defined:<br />

state-of-the-art review on analysis and testing methods; implementation of modelling technique in FEM/BEM code; definition<br />

of analysis/test methodology; parametric breadboard design and test plan; and analysis, test and correlation of vibration and<br />

vibroacoustic loads.<br />

Deliverables:<br />

Documentation and breadboard.<br />

Current TRL: TRL1 Target TRL: TRL3 Application Need/Date: TRL5 >2010<br />

solar array structures, deployable<br />

Application/Mission: radiator structures, deployable flat Contract Duration: 18 months<br />

antenna structures etc.<br />

SW Clause : - Dossier0 Ref.: T-7896<br />

Consistency with Harmonisation<br />

Not directly linked to harmonised technology.<br />

Roadmap and Conclusions:<br />