30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

6.3 - S/C Power<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

EPB-001.C<br />

Development of Regenerative H2/O2 fuelcell<br />

Deliverables:<br />

Current TRL: Target TRL: Application Need/Date:<br />

Application/Mission:<br />

Contract Duration:<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: EPG-025<br />

Title:<br />

Solar Cells Testing Spasolab<br />

A five years contract (220kE/year) is proposed aiming at covering Spasolab 2003-2007 operational phase for supporting solar<br />

cell developments in the <strong>TRP</strong>.<br />

A list of Spasolab solar cell test laboratory capabilities is provided in the following:<br />

• Complete characterisation of space of Space Silicon and Gallium Arsenide solar cells (Type approval tests).<br />

• Development of test methods for the characterization of last generation photo-voltaic devices<br />

• Electrical characterization at panel and mo<strong>du</strong>le level.<br />

• Electrical and environmental characterization at coupon level.<br />

• Calibration of reference solar cells (primary and secondary standards).<br />

• Research and development activities (e.g. elaboration of specifications for new devices).<br />

Deliverables:<br />

Tested samples. Technical note, test results.<br />

Current TRL: N/A Target TRL: N/A Application Need/Date: N/A<br />

Application/Mission: all space projects Contract Duration: 60 months<br />

SW Clause : - Dossier0 Ref.: T-7806<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Solar Generators<br />

Page 136 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!