<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

the deliverable at ESTEC (where more adequate equipments exist). The present CCN will cover the needed upgrading of the<br />

deliverable by adding some peripheral units, including cooler and control electronics, to enable the above mentioned post<br />

delivery tests.<br />

Deliverables:<br />

Compact focal plane breadboard.<br />

Current TRL: TRL2-3 Target TRL: TRL4 Application Need/Date: TRL6 by 2009<br />

Application/Mission: Bepi Colombo Contract Duration: 12 months<br />

SW Clause : - Dossier0 Ref.: T-7887<br />

Consistency with Harmonisation<br />

Optical Remote Passive Instruments - Detectors<br />

Roadmap and Conclusions:<br />