30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T603-14ET<br />

Frequency Flexible Synthesizer Breadboard suitable for O/B TTC<br />

Deliverables:<br />

Current TRL: Target TRL: Application Need/Date:<br />

Application/Mission:<br />

Contract Duration:<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

Frequency Flexible Synthesizer Breadboard suitable for O/B TTC: additional work<br />

The overall objective of this activity is to analyse, design and breadboard a Frequency Flexible Synthesiser for space<br />

application. The S-band TT&C transponders for Near Earth applications represent the main target, but it can be suitable also<br />

for other applications for instance the X-band TT&C Transponders and the downlink Telemetry Transmitters.The Frequency<br />

Flexible Synthesiser shall allow programming the transponder for different RF channels. This can be applied on ground<br />

(before launch), but using a proper command in-flight as well. In-flight frequency agility becomes very useful in particular for<br />

spacecraft constellations, multiple launch solutions (to control in frequency diversity several spacecrafts <strong>du</strong>ring LEOP phase)<br />

and for secure link applications. This activity shall include the following main technical phases: architectural definition of the<br />

overall unit with particular emphasis on the frequency plan issues; design, breadboarding and testing of the frequency<br />

synthesiser; and design development plan (up to the flight model) including all the indications in terms of flight technologies,<br />

risk, sche<strong>du</strong>le and costs.<br />

Deliverables:<br />

Current TRL: Target TRL: Application Need/Date:<br />

Application/Mission:<br />

Contract Duration:<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 159 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!