30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TRP</strong> Work Plan 2005-2007<br />

Complete List of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

2.- Science / Robotic Exploration Preparation<br />

2.2.1 - Darwin (Source: <strong>TRP</strong> 2000-2003)<br />

IPC<br />

Appr.<br />

<strong>TRP</strong> Ref. Title Budget (K€) PP C'try Remarks<br />

SW Clause<br />

applicability<br />

Status as of Contract<br />

2004 2005 2006 2007 2008 31/12/2008<br />

Y2003 EEO-048 BiB detector 350 35 C B IMEC + Alcatel (F) - Contracted 18599<br />

Y2001 MMO-632 Fiber optical wavefront filtering 500 36 C(2) N<br />

Kongsberg + Alcatel, Onera (F) +<br />

Sintef (N)<br />

- Contracted 18772<br />

Y2001 MMO-632 Fiber optical wavefront filtering ph.1 100 C(2) CH<br />

Contrvaves + Astrium, U. Stuttgard<br />

(D) + U. Wien (A) + TNO (NL)<br />

- Contracted 18773<br />

Y2001 MMO-632 Fiber optical wavefront filtering Ph.2 400 C(2) CH<br />

Contrvaves + Astrium, U. Stuttgard<br />

(D) + U. Wien (A) + TNO (NL)<br />

- Contracted 18773<br />

Y2003/<br />

Y2006<br />

MMO-634 High Stability Optical Benches for Darwin 1,000 C Increased budget - Intended<br />

MMS-987 Darwin Solar Array/Solar Shade C<br />

Deferred, awaiting System Study<br />

results. 800 K€<br />

- Deferred<br />

Total 2.2.1 - Darwin (Source: <strong>TRP</strong> 2000-2003) 950 400 36 35 1,000<br />

Page 19 of 97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!