<strong>TRP</strong> W<strong>ORK</strong><strong>PLAN</strong> 2005-2007<br />

Complete List of Activities<br />

issue 1 revision 0<br />

page 3 of 5<br />

(judged in terms of quantity indicated as guidelines of the ITT on<br />

which the C(4) measure is applied). Offers shall provide an<br />

analysis of the potential advantages of the proposed<br />

participation (e.g. long-term rospects for future work). If no such<br />

participation is offered, the bid shall contain evidence of the<br />

effort made to meet these requirements and the reasons for the<br />

lack of success. (Otherwise, the bid will not be considered for<br />

further evaluation).<br />

C(R) = Competition is restricted to a few companies, indicated in the<br />

"Remarks'' column; (Ref. Article 5.2 <strong>ESA</strong> Contract Regulations).<br />

DN/S = Direct Negotiation/Specialisation; the contract will be awarded<br />

by direct negotiation in implementation of a defined in<strong>du</strong>strial<br />

policy or resulting from a sole supplier situation (Ref. Articles<br />

6.1.A,D,F <strong>ESA</strong> Contract Regulations).<br />

DN/C = Direct Negotiation/Continuation; the contract will be awarded in<br />

direct negotiation being the immediate continuation of a previous<br />

activity with the same contractor (Ref. Article 6.1.C <strong>ESA</strong><br />

Contract Regulations)<br />

Country:<br />

Remarks:<br />

Prime contractor country<br />

Provides information on Prime contractor and sub-contractors in case the<br />

activity is contracted or gives other additional info.<br />

Chapter 3 provides the descriptions of the activities. The Technology Activity Template provide<br />

following information:<br />

Description:<br />

Deliverables:<br />

Current TRL:<br />

Target TRL:<br />

Describes the activity, providing the context information, the purpose of<br />

the activity and the main tasks.<br />

Provides short description of the tangible outcome e.g. breadboard,<br />

demonstrator, S/W, test data. A final report is standard for every<br />

activity.<br />

Describes the current NASA TRL level of the pro<strong>du</strong>ct that is going to be<br />

developed in this activity.<br />

The NASA TRL level expected for the pro<strong>du</strong>ct at the end of the activity.<br />

For equipments <strong>TRP</strong> usually concludes with TRL 3, GSTP at level 5/6.<br />

However in the case of components target TRL level in <strong>TRP</strong> could be<br />

higher. It is also understood that TRL levels do not apply to S/W and tools.