<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T608-27QC<br />

Methodology for complex Micro-Propulsion Systems Space Validation<br />

The overall objective of this 12 months preparatory activity is prepare a formal validation/pre-qualification of these complex<br />

micro-systems via GSTP4 in 2005 by using a representative pre-Qualification Model (pre-QM). The idea is to build a<br />

consortium regrouping the suppliers of complex micro-systems, the final users and <strong>ESA</strong> to obtain consensus for approval of<br />

the approach to be taken for validation/pre-qualification.<br />

The results of these discussion will be reported in technical <strong>document</strong>s that will be distributed to other potential interested<br />

parties like other final users (EADS ST, Alenia, Surrey, ...) or NSAs (SNSB, ASA, ASI, CNES, DLR...) and a Round Table will<br />

be organised to obtain consensus for approval of the approach to be taken for validation of the complex micro-systems via<br />

GSTP4 in 2005 and 2006 (Proposals QCT.LM.GSTP05&06).<br />

Deliverables:<br />

Process <strong>document</strong>ation, critical analysis report, test structures description. Evaluation/reliability testing definition, results and<br />

analysis. Final report. Representative test structures, >1 sample of each critical component.<br />

Current TRL: TRL3 Target TRL: TRL3-4 Application Need/Date: TRL5 by 2009<br />

Application/Mission: microsatellites Contract Duration: 12 months<br />

SW Clause : - Dossier0 Ref.: T-857<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: T609-22MP<br />

Title:<br />

Innovative Gas Storage in Satellites<br />

The overall objective of the proposed work is to develop and verify a Breadboard Demonstrator (BD) for a generic<br />

compression and storage system for space applications. The compressor is based on metal hydride (MH)technology with<br />

integrated thermal control system. The system is specifically targeted towards compression and storage for regenerative fuel<br />

cell systems, but adaptable to other space and terrestrial applications, both for hydrogen, oxygen and other gases where<br />

compression and storage are required.<br />

Deliverables:<br />

Compression & Storage System, Breadboard Demonstrator.<br />

Current TRL: TRL1 Target TRL: TRL3 Application Need/Date: TRL5 by 2010<br />

Application/Mission: Application: all satellites Contract Duration: 18 months<br />

SW Clause : - Dossier0 Ref.: T-7574<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 199 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!