30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

6.2 - Space System Software<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

EME-012<br />

Component Oriented Development Techniques<br />

The objective of the activity is to put in practice for space flight software the various techniques used in the wider IT world in<br />

this domain: components, frameworks, model driven development and architecture, aspects features, etc. This includes the<br />

assessment of the state of the art, precision of the vocabulary used in the domain, impact on flight software where the<br />

hardware resources (memory / execution time) are limited, and development of a case study based on prototype generic<br />

architectures or building blocks.<br />

Deliverables:<br />

Component-based space architecture + its assessment in terms of performance and standardisation. (In view of using the<br />

prototype as <strong>ESA</strong> building block for future missions, operational SW is necessary).<br />

Current TRL: algorith Target TRL:<br />

Application Need/Date:<br />

prototype<br />

SW operational by 2009<br />

m<br />

Application/Mission: All missions Contract Duration: 9 months<br />

SW Clause : Operational SW Dossier0 Ref.: T-7671<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

EME-014<br />

Compact Computer Core S/W<br />

Deliverables:<br />

Current TRL: Target TRL: Application Need/Date:<br />

Application/Mission:<br />

Contract Duration:<br />

SW Clause : - Dossier0 Ref.:<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

<strong>TRP</strong> Reference: EME-017<br />

Title:<br />

Tools For The Pro<strong>du</strong>ction Of O/B Sw Running On New Generation Computers<br />

The objective of the study, is to prepare the software (SW) environment related to the new generation computer (based on<br />

Sparc V8). Priority will be given to the compiler and run-time system, then the debugger and the target simulator.<br />

Deliverables:<br />

SW breadboard<br />

Current TRL: - Target TRL: S/W release Application Need/Date: SW operational >=2007<br />

Application/Mission: All missions within LEON Contract Duration: 8 months<br />

SW Clause : Open Source Code Dossier0 Ref.: T-7743<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 132 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!