30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

3.8 - Payload Data Handling<br />

<strong>TRP</strong> Reference:<br />

T310-02ES<br />

Title: COTS based space borne computer 1<br />

The use of COTS components for the design of on-board computers is not new but has always been considered in a<br />

case-by-case basis when appropriate. Convergence between several in<strong>du</strong>strial domains: aircraft, automotive and space have<br />

demonstrated that COTS-based solutions used in these domains can be applied also to space. Evolution of the system design<br />

techniques is also rendering possible the use of robustness by design techniques better than intrinsic robustness by radiation<br />

hardening. It is then proposed to study COTS based solution for on-board computers in the domain of high reliability oriented<br />

systems and safety & availability oriented systems. The objective of this activity is to propose solutions towards space borne<br />

COTS based computers and to assess their efficiency and usability for real space missions. At the software level there are<br />

considerations about the reintegration of a failed unit. It is difficult point since modern powerful processors contain on-chip<br />

caches. Reloading of these caches is not possible, and thus the software in the triple units has to be aware that a<br />

resynchronisation is taking place and thus needs to flush the data and instruction caches of the non-failed units. Continuation<br />

of this activity is foreseen in GSTP.<br />

Deliverables:<br />

Breadboard<br />

Current TRL: TRL2 Target TRL: TRL3 Application Need/Date: TRL5 by 2010<br />

Application/Mission: Robotics, Exploration Missions Contract Duration: 12 months<br />

SW Clause : - Dossier0 Ref.: T-7800<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 68 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!