30.12.2014 Views

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

document title / titre du document TRP W ORK PLAN ... - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TRP</strong> Work Plan 2005-2007<br />

Description of Activities<br />

TEC-SB/7935/dc<br />

12/Feb/09<br />

4.3 - Materials and Structures / Advanced Structures<br />

<strong>TRP</strong> Reference:<br />

Title:<br />

T405-01MC<br />

Non-destructive inspection methods for re-usable CFRP structures<br />

Secure NDI methods for CFRP structures are mandatory to guarantee re-use of reusable launcher structures like CFRP<br />

LH2-tanks or to identify maintenance or repair needs. Baseline technology and widely used is ultrasonic inspection (US), but it<br />

has some limitations (exact damage detection and location, damage detection in complex and large structures, mobility of<br />

inspection system, accuracy of information). Other inspection technologies meanwhile reached respective maturity and are<br />

interesting alternatives. It is proposed to perfom non-destructive inspection of structures for RLV, in particular: identification<br />

typical re-usable launcher structures for inspection, Technology Review of Existing Methods, NDI Methods Evaluation<br />

Program (Damage Sample Test Program), Damage Classification for Re-Usable CFRP Structures, CFRP structure test<br />

program (e.g. tank structure), Recommendations and Synthesis.<br />

Deliverables:<br />

Technical notes: survey of typical re-usable launcher structures for inspection and existing methods, NDI Methods Evaluation<br />

Program, Re-Usable CFRP structures damages classification and test program, test specimens.<br />

Current TRL: TRL1 Target TRL: TRL2-3 Application Need/Date: TRL5 by 2010<br />

RLV and ELV structures, composite<br />

Application/Mission: tanks / spacecraft tanks; FLPP Contract Duration: 18 months<br />

demonstration vehicle<br />

SW Clause : - Dossier0 Ref.: T-8134<br />

Consistency with Harmonisation<br />

Roadmap and Conclusions:<br />

Page 88 of 227

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!