We Energies Coal Combustion Products ... - The White House
We Energies Coal Combustion Products ... - The White House
We Energies Coal Combustion Products ... - The White House
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Index<br />
Pavement, 26, 109, 187; bottom ash, 38,<br />
159-165, 169; cold-in-place recycling,<br />
18, 47, 185-192, 188, 192, 275-277;<br />
County highway JK (Waukesha<br />
county, Wis.), 189-191, 191; Maple<br />
Avenue (Sussex, Wis.), 91, 92; pilot<br />
projects, 88, 88-105, 90-93, 108-112,<br />
111, 163-165, 185-192, 188, 192;<br />
specifications, 249-254; <strong>We</strong>st<br />
Highland Avenue (Mequon, Wis.),<br />
185-189, 188<br />
Permeability, air, 81-82, 82-83, 87-88;<br />
backfill, 166, 167; boiler slag, 23;<br />
bottom ash, 21, 22, 160, 161, 166,<br />
167; chloride ion, 77-78, 85-88, 86-87,<br />
97, 104, 106, 107; concrete, 50, 77-<br />
88, 82-87, 97, 104, 106, 107, 120,<br />
122, 123, 124, 127, 128; controlled<br />
low strength material, 130, 145, 146,<br />
150, 151, 152, 155; fly ash, 18;<br />
gypsum, 25; electrical, 120, 122, 123,<br />
124, 128, 146, 150, 151, 152; mixture<br />
design, 78, 79; testing procedures,<br />
81; water, 83-84, 84-86, 87-88<br />
Pilot projects, A. W. Oakes & Son, 164-<br />
165, 165; base course, 108-112, 163-<br />
165, 165; bottom ash, 163-165, 165,<br />
169-170, 170, 173, 173, 174; cold-inplace<br />
recycling, 185-191, 188;<br />
concrete, 88-105, 108-112; controlled<br />
low strength material, 153-154;<br />
County highway JK (Waukesha<br />
county, Wis.), 189-191, 191; fly ash,<br />
88-105, 108-112, 153-154, 185-192;<br />
green roofs, 173, 173, 174; Lakeview<br />
Corporate Park, 163-164;<br />
landscaping, 169-170, 173, 173, 174;<br />
manufactured soil products, 169-170,<br />
170; Maple Avenue (Sussex, Wis.),<br />
91, 92; parking lot, 191-192, 192;<br />
pavement, 88, 88-105, 90-93, 111,<br />
163-165, 185-192, 188, 192; Pleasant<br />
Prairie Power Plant, 91-105, 93, 174-<br />
177, 175; Port Washington Power<br />
Plant, 108-112, 111; recovery, 174-<br />
177, 175; Sussex Corporate Center,<br />
88, 88-90, 90; <strong>We</strong>st Highland Avenue<br />
(Mequon, Wis.), 185-189, 188<br />
PIPP See Presque Isle Power Plant<br />
PIXE See Proton Induced X-ray Emission<br />
Spectroscopy<br />
Plastic limit, 21, 43<br />
Plastic soil-cement See Controlled low<br />
strength material<br />
Plasticity, 22, 23, 25<br />
Plastics compatibility, 140-143<br />
Pleasant Prairie Power Plant, 4, 5, 28-29,<br />
29; ash reburning, 179; ash recovery,<br />
174-177, 175; landfill, 174-177, 175;<br />
map, 32; pilot project, 91-105, 93,<br />
174-177, 175; statistics, 26, 28<br />
Pleasant Prairie Power Plant (bottom ash),<br />
abrasion, 43, 44-45; Atterberg limits,<br />
43, 44-45; chemical composition, 37;<br />
density, 38, 45, 167; drainage, 167;<br />
elemental analysis, 209; freeze-thaw<br />
resistance, 44-45; gradation, 20, 43,<br />
44-45, 166; hydraulic conductivity, 38;<br />
leaching, 211; moisture content, 38;<br />
permeability, 167; physical properties,<br />
38, 159-161, 161-162; research, 159-<br />
164, 169; size, 39, 41; soundness, 44-<br />
45, 45<br />
Pleasant Prairie Power Plant (fly ash),<br />
chemical composition, 34, 55;<br />
consistency, 34, 35-36; elemental<br />
analysis, 205; fineness, 35, 36, 55;<br />
leaching, 207; loss on ignition, 34, 36;<br />
mercury, 224-225, 225-226; moisture<br />
content, 34; physical properties, 36,<br />
55; pilot projects, 88-105, 185-189;<br />
pozzolanic activity index, 55;<br />
research, 54-88, 117-118, 130-134,<br />
155; soundness, 36, 55; specific<br />
gravity, 36, 55; strength, 36, 54-64,<br />
56-61; water demand, 36, 55, 62-63,<br />
62-63<br />
Poisson's ratio, 67-68, 67-68, 71<br />
Pollution See Environmental<br />
considerations<br />
Porosity, 49, 50, 54<br />
Port Washington Power Plant, 27, 29, 29-<br />
30; map, 32; pilot project, 108-112,<br />
111; statistics, 26, 29<br />
Port Washington Power Plant (bottom<br />
ash), density, 38; drainage, 167;<br />
elemental analysis, 208; hydraulic<br />
conductivity, 38; leaching, 210;<br />
moisture content, 38; permeability,<br />
167; physical properties, 38; research,<br />
170<br />
Port Washington Power Plant (CLSM),<br />
elemental analysis, 212; leaching, 213<br />
Port Washington Power Plant (fly ash),<br />
chemical composition, 138; elemental<br />
analysis, 204; fineness, 138; leaching,<br />
206; physical properties, 138;<br />
pozzolanic activity index, 138;<br />
research, 118-122, 138-140, 143-146;<br />
specific gravity, 138; water demand,<br />
138<br />
Portland cement See Cement<br />
Post-combustion controls, 4, 223-227<br />
Powder Metallurgy, 194-195<br />
Power plants, 9-10, 12-13; ash generation<br />
process, 10-11, 14; base loaded, 33;<br />
map, 32; pulverized coal fired, 2, 9-<br />
10, 12, 28-31; stoker-fired, 1-2, 9, 27;<br />
285 <strong>We</strong> <strong>Energies</strong><br />
<strong>Coal</strong> <strong>Combustion</strong> <strong>Products</strong><br />
Utilization Handbook