10.07.2015 Views

Guide on Climate Change and Indigenous Peoples

Guide on Climate Change and Indigenous Peoples

Guide on Climate Change and Indigenous Peoples

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

R-PP - ReadinessPreparati<strong>on</strong> Proposal,replaced R-Plan orReadiness Plan. reference scenario, m<strong>on</strong>itoring, REDDimplementati<strong>on</strong> framework still need furtherelaborati<strong>on</strong>; timing <strong>and</strong> applicati<strong>on</strong> of WB Safeguards notyet clearly understood.• From R-Plan to R-PP - Onthe basis of these earlyless<strong>on</strong>s, it was decidedthat instead of using theterm R-Plan, the termwhich will be used willbe Readiness Preparati<strong>on</strong>Proposal (R-PP) which willbe harm<strong>on</strong>ized with theUN-REDD Nati<strong>on</strong>al JointProgramme.4 Key Comp<strong>on</strong>ents of R-PP• Framework c<strong>on</strong>sultati<strong>on</strong>: organize<strong>and</strong> c<strong>on</strong>sult• REDD Strategy (General <strong>and</strong> specific)• Reference scenario <strong>and</strong>• nati<strong>on</strong>al m<strong>on</strong>itoring <strong>and</strong> evaluati<strong>on</strong>system. It was also proposed thatthere will be comm<strong>on</strong> budgetsheets <strong>and</strong> comm<strong>on</strong> c<strong>on</strong>sultati<strong>on</strong>guidanceRecommendati<strong>on</strong>s approved in the lightof the R-PP proposal1. Review <strong>and</strong> assess 3 existing R-Plans <strong>on</strong> the basis of criteria proposed inProgram Note (FMT2009 – 1 Rev.4) <strong>on</strong> “Review <strong>and</strong> Assessment of ReadinessPreparati<strong>on</strong> Proposals:”• make recommendati<strong>on</strong>s for areas of improvement• determine whether an R-PP provided sufficient basis to proceed withReadiness Preparati<strong>on</strong> Grant (up to $3.6 milli<strong>on</strong>)2. C<strong>on</strong>sider the applicability of existing program note criteria for any new R-PP.iii. What are indigenous peoples’ resp<strong>on</strong>ses to the FCPF?• When the FCPF was launched in Bali, indigenous peoples present<strong>and</strong> the Chair of the Permanent Forum criticized str<strong>on</strong>gly the lack ofengagement with indigenous peoples. As a result, the FCPF heldmeetings with indigenous peoples <strong>and</strong> discussed ways in which they canbe more effectively involved.• In 2008 to 2009, several regi<strong>on</strong>al c<strong>on</strong>sultati<strong>on</strong> workshops were heldbetween the FCPF <strong>and</strong> indigenous peoples in Asia, Latin America <strong>and</strong>Africa. Views comm<strong>on</strong> in these c<strong>on</strong>sultati<strong>on</strong>s were: The UNDRIP <strong>and</strong> ILO C<strong>on</strong>venti<strong>on</strong> No. 169 should guide theformulati<strong>on</strong> <strong>and</strong> implementati<strong>on</strong> of projects supported by this64 <str<strong>on</strong>g>Guide</str<strong>on</strong>g> <strong>on</strong> <strong>Climate</strong> <strong>Change</strong> <strong>and</strong> <strong>Indigenous</strong> <strong>Peoples</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!