- Page 1:
Short Range Transit PlanFY 2007/08
- Page 9 and 10:
List of TablesTable 1.1 ECCTA Servi
- Page 11 and 12:
Executive SummaryChapter One of thi
- Page 13 and 14:
Introduction & OverviewCHAPTER1Purp
- Page 15 and 16:
Table 1.1 ECCTA Service Area Popula
- Page 17 and 18:
For purposes of discussions relativ
- Page 19 and 20:
Commute & Other Travel PatternsAs p
- Page 21 and 22:
This data is presented in Table 1.4
- Page 23 and 24:
• Marketing and Operations Commit
- Page 25 and 26:
Figure 1.2a. Tri Delta Transit Rout
- Page 27 and 28:
Route 200 -Martinez/Pittsburg links
- Page 29 and 30:
ECCTA Dial-a-RideDial-a-Ride is the
- Page 31 and 32:
Fare StructureThe ECCTA Board of Di
- Page 33 and 34:
ModelYearNumberFixed RouteTable 1.7
- Page 35 and 36:
Goals, Objectives & StandardsBackgr
- Page 37 and 38:
Table 2.2 Summary of ECCTA Objectiv
- Page 39 and 40:
CHAPTER3System & Service Evaluation
- Page 41 and 42:
DestinationsTotalBoardingsTotalRVHE
- Page 43 and 44:
In FY 2002-03, increases in unit op
- Page 45:
Individual Fixed Route PerformanceP
- Page 49 and 50:
The best performing local routes du
- Page 51 and 52:
Figure 3.7 DAR Total Boardings, FY
- Page 53 and 54:
Dial-A-Ride/Paratransit Trends by T
- Page 55 and 56:
City of Antioch. The farebox cost r
- Page 57 and 58:
DAR Evaluation SummaryTri Delta Tra
- Page 59 and 60:
The Brentwood park-ride lot is phys
- Page 61 and 62:
Each completed survey provides info
- Page 63 and 64:
Those aged 12 to 30 constitute 60%
- Page 65 and 66: Most transit users (77%) ride the b
- Page 67 and 68: Figure 3.21 shows in another way th
- Page 69 and 70: MTC Sponsored Survey, February 2007
- Page 71 and 72: the adopted productivity standard,
- Page 73 and 74: Federal Title VI ProgramECCTA has e
- Page 75 and 76: CHAPTER4Bus Rapid Transit (BRT) Opt
- Page 77 and 78: While left-hand doors reduce EmX ve
- Page 79 and 80: According to the FTA report “Las
- Page 81 and 82: Figure 4.9 Typical MAX StationEach
- Page 83 and 84: Figure 4.12 Orange Line BRT Vehicle
- Page 85 and 86: The Bus way has suffered from many
- Page 87 and 88: Figure 4.17 Pittsburgh South Bus wa
- Page 89 and 90: Mixed traffic BRT routes with trans
- Page 91 and 92: Figure 4.19 Tri Delta Transit Fixed
- Page 93 and 94: to the proposed Railroad Avenue and
- Page 95 and 96: Figure 4.21 Elevated BRT Station Co
- Page 97 and 98: CHAPTER5Operations Plan and BudgetT
- Page 99 and 100: Transit ChallengesTri Delta Transit
- Page 101 and 102: Another potential opportunity for i
- Page 103 and 104: The orig inal eBART proposal would
- Page 105 and 106: Based on the principles listed abov
- Page 107 and 108: Future Tri Delta Transit route revi
- Page 112 and 113: 100
- Page 114 and 115: Table 6.1 ECCTA Planned CapitalPrio
- Page 118 and 119: AppendixRESOLUTION #080123cBay Area
- Page 120 and 121: Goals1. Everyone in the Bay Region