5.8.5 Other protective devices<br />

The transformer as supplied by the purchaser will be fitted with following warning and<br />

protective devices.<br />

i) Low oil level alarm.<br />

ii) Buchholz relay with alarm and trip contact.<br />

iii) Oil temperature indicator with alarm and trip contact<br />

iv) Winding tempreature indicator with alarm and trip contact<br />

These contact shall be wired up to a weather pro<strong>of</strong> terminal box mounted on the transformer<br />

by the transformer manufacturer .The connection shall be extended to the alarm and<br />

trip circuit as well as to annunciator provided on the <strong>control</strong> board.<br />

5.9 SCHEME OF PROTECTION FOR 25KV OVERHEAD EQUIPMENT<br />

5.9.1 The sub-station <strong>equipment</strong> as well as the over head <strong>equipment</strong> is protected<br />

against short circuit and over load by means <strong>of</strong> feeder circuit breakers .Norally the tracks on<br />

one side <strong>of</strong> the sub-station are fed through one feeder circuit breakers in case defect on one<br />

feeder,the other feeder circuit breaker is arranged to feed track on both side <strong>of</strong> the substation.To<br />

protection scheme shall full-fill the following function<br />

i) To detect all short circuit over the zone <strong>of</strong> overhead <strong>equipment</strong> fed by the feeder<br />

circuit breaker.<br />

ii) To operate with minimum delay in opening the circuit breakers.<br />

iii) To refrain from operation at the maximum working current i.e discriminate between<br />

the maximum load currents and short circuit current even though the magnitude <strong>of</strong><br />

the former is at time more than the latter especially when the fault are <strong>remote</strong> from<br />

the sub-station<br />

iv) To detect and isolate fault on the OHE caused by accidental coupling <strong>of</strong> two different<br />

phase from adjacent sub-station<br />

v) To provide single shot auto-reclosing <strong>of</strong> the feeder circuit breaker after a present<br />

time interval adjustable between0.5secs.to 30 secs.<br />

vi) To reclose the 25kv feeder circuit breaker through single shot automatic reclosing<br />

scheme in the event <strong>of</strong> feeder circuit breakers tripping on fault through any <strong>of</strong> the<br />

three relays viz.admitance(MHo)relay for wrong phase coupling and instantaneous<br />

over current relay.<br />

vii) To detect and isolate the flashover caused by pantograph on an overlap in front <strong>of</strong><br />

Traction Substation when panto moves from live to dead section over the insulated<br />

over lap. This protection is provided by panto flasover Relay.<br />

viii) To detect and isolate a high resistance OHE ground fault. This fault can not be<br />

105