23.11.2012 Views

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

) To direct and supervise work during the period power block is in<br />

force;<br />

c) Confirmation regarding cancellation <strong>of</strong> power block by each<br />

individual party and cancellation <strong>of</strong> power block.<br />

9. Other Communication facilities:<br />

An independent inter-communication circuit is also provided between<br />

the various Section Controllers and the Chief Controller for local<br />

communication between themselves. Facilities are also provided for<br />

the Chief Controller to talk to any station on train <strong>control</strong>, deputy<br />

<strong>control</strong>, stock <strong>control</strong> and traction loco <strong>control</strong> circuits. Similarly,<br />

facilities are provided to TPC to talk to any station on the train <strong>control</strong><br />

and traction loco <strong>control</strong> in an emergency. However, it will not be<br />

possible for Chief Controller or TPC to ring independently any station<br />

on station on any <strong>control</strong> circuit as this ringing facility is only provided<br />

to the respective Controllers.<br />

View <strong>of</strong> Traction Substation<br />

--------------------<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!