c) Procedure to be followed in case <strong>of</strong> failure <strong>of</strong> supply and information to<br />
be conveyed by grid sub-station operator regarding duration <strong>of</strong> failure<br />
and anticipated time <strong>of</strong> restoration to enable emergency works to be<br />
introduced.<br />
d) Records to be maintained by grid sub-station operators and TPC<br />
regarding emergency feed arrangements.<br />
e) List <strong>of</strong> <strong>of</strong>fice and residential telephone numbers <strong>of</strong> important grid and<br />
railway <strong>of</strong>ficials to be contacted in an emergency.<br />
f) Mutual assistance to be rendered for transmission <strong>of</strong> important<br />
messages in the event <strong>of</strong> telephone failures at the grid sub-stations or<br />
RCC.<br />
2.8 Statistical Data regarding Energy Consumptions<br />
In the divisional <strong>of</strong>fice, a register should be maintained to record month-wise<br />
the following particulars in regards to energy consumption at each supply point :-<br />
a) Energy consumption (kWh)<br />
b) Maximum demand (kVA)<br />
c) Average power factor (kWh/kVAh)<br />
d) Monthly average load factor (percent)<br />
e) Payment for energy.<br />
f) Payment for maximum demand<br />
g) Payment towards meter rent<br />
h) Payment <strong>of</strong> fuel surcharge, if any<br />
i) Payment for P.F. surcharge/penal charge<br />
j) Payment <strong>of</strong> covering the minimum guarantee load, if any<br />
k) Other payment, if any<br />
l) Total amount <strong>of</strong> bill under all heads.<br />
m) Average total cost per kWh<br />
A consolidated statement giving the above details for all supply points should<br />
be furnished by Sr. DEE(TrD) to CEE each month by a stipulated date. CEE will in<br />
turn furnish a monthly statement in the prescribed pr<strong>of</strong>orma to the Railway Board<br />
and Research Design and Organisation (RDSO)<br />
--------------------<br />
16