23.11.2012 Views

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

c) Procedure to be followed in case <strong>of</strong> failure <strong>of</strong> supply and information to<br />

be conveyed by grid sub-station operator regarding duration <strong>of</strong> failure<br />

and anticipated time <strong>of</strong> restoration to enable emergency works to be<br />

introduced.<br />

d) Records to be maintained by grid sub-station operators and TPC<br />

regarding emergency feed arrangements.<br />

e) List <strong>of</strong> <strong>of</strong>fice and residential telephone numbers <strong>of</strong> important grid and<br />

railway <strong>of</strong>ficials to be contacted in an emergency.<br />

f) Mutual assistance to be rendered for transmission <strong>of</strong> important<br />

messages in the event <strong>of</strong> telephone failures at the grid sub-stations or<br />

RCC.<br />

2.8 Statistical Data regarding Energy Consumptions<br />

In the divisional <strong>of</strong>fice, a register should be maintained to record month-wise<br />

the following particulars in regards to energy consumption at each supply point :-<br />

a) Energy consumption (kWh)<br />

b) Maximum demand (kVA)<br />

c) Average power factor (kWh/kVAh)<br />

d) Monthly average load factor (percent)<br />

e) Payment for energy.<br />

f) Payment for maximum demand<br />

g) Payment towards meter rent<br />

h) Payment <strong>of</strong> fuel surcharge, if any<br />

i) Payment for P.F. surcharge/penal charge<br />

j) Payment <strong>of</strong> covering the minimum guarantee load, if any<br />

k) Other payment, if any<br />

l) Total amount <strong>of</strong> bill under all heads.<br />

m) Average total cost per kWh<br />

A consolidated statement giving the above details for all supply points should<br />

be furnished by Sr. DEE(TrD) to CEE each month by a stipulated date. CEE will in<br />

turn furnish a monthly statement in the prescribed pr<strong>of</strong>orma to the Railway Board<br />

and Research Design and Organisation (RDSO)<br />

--------------------<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!