remote control equipment - Indian Railways Institute of Electrical ...
remote control equipment - Indian Railways Institute of Electrical ...
remote control equipment - Indian Railways Institute of Electrical ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CHECK UST FOR INSPECTIONS<br />
1.0 PSI depots including Subordinate Offices<br />
a) OHE/PSI Depots.<br />
Check<br />
1. Staff grievance register. 6. Stock position in Stores.<br />
49<br />
Annexure .3.01<br />
2. Quarter register. 7, Compliance <strong>of</strong> audit & account<br />
3. Attendance Register inspection notes.<br />
4. Cleanliess <strong>of</strong> Depot 8. Test & Trial report.<br />
5. Upkeep <strong>of</strong> Stores 9. Availability <strong>of</strong> latest drawings and<br />
b) Subordinate <strong>of</strong>fice,-<br />
Check<br />
1. Attendance register.<br />
specifications.<br />
10. Planning and progress <strong>of</strong> section<br />
works.<br />
2. Compliance <strong>of</strong> audit & account inspection notes.<br />
3. Compliance <strong>of</strong> Officer's inspection notes.<br />
4. Test & Trial report,<br />
5. Availability <strong>of</strong> Drgs. & specification.<br />
6. Progress & planning <strong>of</strong> section works.<br />
2.0 Inspection <strong>of</strong> Grid Substation<br />
1. Be on look out for any modifications made / being made in the power<br />
supply arrangement.<br />
2. Check up if there is any <strong>equipment</strong> under breakdown which is likely to<br />
increase risk <strong>of</strong> interruption in power supply to traction.<br />
3. Note down meter readings and scrutini2e and record important data<br />
regarding power supply parameters including daily MD, variation in<br />
voltage, frequency and power factor