23.11.2012 Views

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHECK UST FOR INSPECTIONS<br />

1.0 PSI depots including Subordinate Offices<br />

a) OHE/PSI Depots.<br />

Check<br />

1. Staff grievance register. 6. Stock position in Stores.<br />

49<br />

Annexure .3.01<br />

2. Quarter register. 7, Compliance <strong>of</strong> audit & account<br />

3. Attendance Register inspection notes.<br />

4. Cleanliess <strong>of</strong> Depot 8. Test & Trial report.<br />

5. Upkeep <strong>of</strong> Stores 9. Availability <strong>of</strong> latest drawings and<br />

b) Subordinate <strong>of</strong>fice,-<br />

Check<br />

1. Attendance register.<br />

specifications.<br />

10. Planning and progress <strong>of</strong> section<br />

works.<br />

2. Compliance <strong>of</strong> audit & account inspection notes.<br />

3. Compliance <strong>of</strong> Officer's inspection notes.<br />

4. Test & Trial report,<br />

5. Availability <strong>of</strong> Drgs. & specification.<br />

6. Progress & planning <strong>of</strong> section works.<br />

2.0 Inspection <strong>of</strong> Grid Substation<br />

1. Be on look out for any modifications made / being made in the power<br />

supply arrangement.<br />

2. Check up if there is any <strong>equipment</strong> under breakdown which is likely to<br />

increase risk <strong>of</strong> interruption in power supply to traction.<br />

3. Note down meter readings and scrutini2e and record important data<br />

regarding power supply parameters including daily MD, variation in<br />

voltage, frequency and power factor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!