d) Measure the IR between auxiliary <strong>control</strong> and motor circuit The value<br />

shall be min. 2 Mega Ohm with 500 V megger.<br />

e) Measure the IR between open contacts and earth The min . value shall<br />

be 1,000 M Ohm with 2.5 kV. megger.<br />

f) Check the charging time <strong>of</strong> compressor from 0 to 15 kg/cm 2 for<br />

pneumatic operating mechanism It should be less than 35 minutes.<br />

g) Check the gap <strong>of</strong> closing and trip coil assembly as per instruction<br />

manual.<br />

h) Check the oil leakage from shock absorber. If leaking replaces the<br />

same,<br />

i) Check free movement <strong>of</strong> various latches in operating mechanism,<br />

j) Check compressor oil condition and its level Change the oil in case it<br />

has turned yellow.<br />

k) Check V - belt for its tension and soundness.<br />

Three Yearly Schedule :<br />

During Three Yearly maintenance, following items shall be attended/ Checked<br />

over and above the items covered in Annual and Quarterly Maintenance:<br />

a) Measure the mechanical travels as per instruction manual and adjust if<br />

required.<br />

b) Replace the door gasket <strong>of</strong> the operating mechanism with new one.<br />

c) Measure the value <strong>of</strong> contact resistance <strong>of</strong> pole between upper<br />

terminal and lower terminal If value is more than 120% <strong>of</strong> the design<br />

value specified in maintenance manual. Approach the manufacturer for<br />

rectification.<br />

d) Check the movement <strong>of</strong> 'C'& 'D ’ rollers for its free movement If not free<br />

change the same (for M/s. CGL make CB)<br />

Eight Yearly Schedule :<br />

The following items shall be checked /attended (without dismantling the C.B./<br />

Interrupter) if circuit breaker has completed 08 years <strong>of</strong> service or 2000 electrical<br />

switching operations or 5000 mechanical co-operations. In case <strong>of</strong> interrupter,<br />

following items shall be attended if it has completed 08 years <strong>of</strong> service or 5000<br />

<strong>Electrical</strong> / Mechanical co-operation. This schedule can be categorized for its two<br />

parts separately, i.e. operating mechanism system and interrupting pole unit.<br />