remote control equipment - Indian Railways Institute of Electrical ...
remote control equipment - Indian Railways Institute of Electrical ...
remote control equipment - Indian Railways Institute of Electrical ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.1 Schedules<br />
MAINTENANCE OF SF6 CIRCUIT BREAKERS<br />
64<br />
Annexure 3.06<br />
The maintenance and check execution standard depends upon the working<br />
conditions <strong>of</strong> the CB. The checks to be carried out. Their frequency and scope are<br />
broadly as under:<br />
Type <strong>of</strong> check Frequency Scope<br />
Patrol<br />
Inspection<br />
Ordinary<br />
inspection<br />
Detailed<br />
Inspection<br />
Incidental<br />
Inspection<br />
1.2 General<br />
Every week<br />
After every<br />
1000 operations<br />
After every<br />
3000 operations<br />
The patrol inspection is an external check<br />
<strong>of</strong> the circuit breaker in live conditions for<br />
irregularities.<br />
The ordinary inspection is inspection<br />
Performed by turning <strong>of</strong>f the circuit breaker<br />
for a relatively short time for simple<br />
inspection and servicing with emphasis on<br />
functional checks e.g. visual check <strong>of</strong><br />
irregularities and cleaning <strong>of</strong> dust and dirt.<br />
The detailed inspection is an inspection<br />
performed by turning <strong>of</strong>f the circuit breaker<br />
for a relatively long time. To dismantle and<br />
inspect the mechanism for irregularities for<br />
the purpose <strong>of</strong> continuously maintaining the<br />
performance.<br />
____ The incidental inspection is performed<br />
when inspection and repair are necessary<br />
due to the detection <strong>of</strong> an irregularity during<br />
patrol inspection.<br />
Attention should be paid to the following points during ordinary and detailed inspection.<br />
a) Switch <strong>of</strong>f <strong>control</strong>/compressor motor supply. Discharge all the air in the air receiver<br />
through the drain value.<br />
b) The circuit breaker is to be inspected in the open position unless otherwise specified<br />
in these Instructions. At the open position <strong>of</strong> the breaker the safety pins for preventing<br />
closing and opening must be inserted. On completion <strong>of</strong> the safety pins must be removed.<br />
c) Good quality grease should be used adequately.<br />
d) Circlips and split pins which are removed must be replace with new ones.<br />
e) Removed “O” rings must be replaced with new ones. While handling and placing “O”<br />
rings in their grooves. Care should be taken to avoid dust falling on them.